WELL · 42-239-32424 · DISTRICT 2
Yaussi #B 10T
Jackson County · Cordele West (2800) field · Vertical
Yaussi #B 10T (API 42-239-32424) is a plugged well in Jackson County, plugged March 11, 2002, last operated by Cameron Paul E. JR. Inc..
The RRC has issued 3 drilling permits (amended once) between 1988 and 2001, permitted to 3,226 ft.
It was permitted by Continental Operating CO. and has since transferred to Cameron Paul E. JR. Inc. on the wellbore schedule.
Operator of record
Permitted by Continental Operating Co.; the EWA schedule now lists a different operator.
Montgomery, TX · P-5 Y, filed Nov 7, 2014 · 285 permits on file · (713) 725-1919
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cameron Paul E. Jr. Inc. |
| Production reports | Continental Operating Co.through Jan 2001 |
| Latest permit | Continental Operating Co.Sep 27, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,226
- total depth, ft
- 4
- permits on file
- Sep 27, 2001
- last permit issued
- Oct 27, 1988
- completed
- 0
- cumulative oil, bbl
- 344K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 27, 1988
- Shut in
- —
- Plugged
- Mar 11, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yaussi -B- G-2-129758 | Cordele, West (Stray 2250) | Continental Operating Co. | 1 | 0 | 344K | Jan 1993 – Mar 2002 |
| Yaussi -B- G-2-130081 | Cordele, West (2300) | Continental Operating Co. | 1 | 0 | 131 | Jan 1993 – Mar 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1New London Oil Inc.Jan 1993 → Feb 1993
- 2Continental Operating Co.Mar 1993 → Jan 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 513855-99 | Recompletion | Continental Operating Co. | Sep 24, 2001 | Sep 27, 2001 | — | 3,226 |
| 355820-99 | Recompletion | Cameron, Paul E., Jr., Inc. | Feb 3, 1989 | Feb 7, 1989 | — | 3,220 |
| 350216-98 | Drill | Cameron, Paul E., Jr., Inc. | Nov 14, 1988 | Aug 17, 1988 | — | 3,220 |
| 350216-99 | Drill | Cameron, Paul E., Jr., Inc. | Aug 16, 1988 | Aug 17, 1988 | Oct 16, 1988 | 3,220 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-129758 | — | — | — | — |
| — | — G-2-130081 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,259 | 2,266 | Perforated |
| 2,730 | 2,734 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,241 | 12.25 | 410 S |
| 4.5 | 3,226 | 7.875 | 640 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 28, 1989 | Feb 3, 1989 | Yes |
| 00 | Mar 22, 1989 | — | — |
| 00 | Mar 1, 1989 | Feb 3, 1989 | Yes |
| 00 | Feb 14, 1989 | — | — |
| 00 | Feb 9, 1989 | Nov 14, 1988 | Yes |
| 00 | Feb 3, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32424 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32424 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932424, documented in the API reference.