WELL · 42-239-32498 · DISTRICT 2
Yaussi -A- #13
Jackson County · Cordele (1750 Pinhead) field · Vertical
Yaussi -A- #13 (API 42-239-32498) is a plugged well in Jackson County, plugged October 21, 2022, last operated by Rwa LLC.
The RRC has issued one drilling permit, issued June 21, 1989, permitted to 2,100 ft.
It was permitted by Tri-C Resources, Inc. and has since transferred to Rwa LLC on the wellbore schedule.
Completion filings report one formation top, including Miocene (undifferentiated).
Operator of record
Permitted by Tri-C Resources, Inc.; the EWA schedule now lists a different operator.
Boyd, TX · P-5 Y, filed Sep 4, 2025 · 14 permits on file · (940) 452-8284
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rwa LLC |
| Production reports | Atasca Resources, Inc.through Oct 1997 |
| Latest permit | Tri-C Resources, Inc.Jun 21, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,100
- total depth, ft
- 1
- permits on file
- Jun 21, 1989
- last permit issued
- Jul 31, 1989
- completed
- 0
- cumulative oil, bbl
- 406K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 31, 1989
- Shut in
- —
- Plugged
- Oct 21, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yaussi -A- G-2-131624 | Cordele (1750 Pinhead) | Rwa, LLC | 1 | 0 | 281K | Jan 1993 – Oct 2022 |
| Yaussi -A- G-2-132634 | Chula Vista (1800' Sand) | Rwa, LLC | 1 | 0 | 125K | Jan 1993 – Oct 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Scana Petroleum Resources, Inc.Jan 1993 → May 1996
- 2Atasca Resources, Inc.Jun 1996 → Oct 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 360433-99 | Drill | Tri-C Resources, Inc. | Jun 15, 1989 | Jun 21, 1989 | Jun 29, 1989 | 2,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-131624 | — | — | — | — |
| — | — G-2-132634 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 13 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1 | 12 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,738 | 1,746 | Perforated |
| 1,800 | 1,805 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 800 | 12.25 | 370 S |
| 4.5 | 2,100 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 19, 1989 | Aug 18, 1989 | Yes |
| 00 | Dec 12, 1989 | — | — |
| 00 | Nov 28, 1989 | Nov 3, 1989 | Yes |
| 00 | Sep 20, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32498 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32498 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932498, documented in the API reference.