WELL · 42-239-32544 · DISTRICT 2
Scott A.J. et AL #1
Jackson County · Arroyo Rojo (Burgher) field · Vertical
Scott A.J. ET AL #1 (API 42-239-32544) is a plugged well in Jackson County, plugged April 20, 1992, last operated by Neumin Production Company.
The RRC has issued 2 drilling permits between 1990 and 1999, permitted to 6,500 ft.
It was permitted by Express Oil CO. and has since transferred to Neumin Production Company on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, 5300 Frio, Vicksburg.
Operator of record
Permitted by Express Oil Co.; the EWA schedule now lists a different operator.
Point Comfort, TX · P-5 Y, filed May 4, 2026 · 380 permits on file · (361) 987-8948
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neumin Production Company |
| Production reports | Express Oil Co.through Jan 2001 |
| Latest permit | Express Oil Co.Apr 9, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 2
- permits on file
- Apr 9, 1999
- last permit issued
- Jun 28, 1990
- completed
- 0
- cumulative oil, bbl
- 108K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1999 THROUGH Feb 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 28, 1990
- Shut in
- —
- Plugged
- Apr 20, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Skalicky G-2-174161 | Arroyo Rojo (Ballard) | Express Oil Co. | 1 | 0 | 108K | Apr 1999 – Feb 2005 |
| — G-2-135463 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Express Oil Co.May 1999 → Jan 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 483758-99 | Reenter | Express Oil Co. | Apr 9, 1999 | Apr 9, 1999 | Apr 12, 1999 | 6,500 |
| 374022-99 | Drill | Neumin Production Company | Jun 1, 1990 | Jun 5, 1990 | Jun 14, 1990 | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-135463 | — | — | — | — |
| — | — G-2-174161 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 74 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,726 | 5,729 | Perforated |
| 6,012 | 6,015 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 704 | 14.75 | 415 S |
| 7.625 | 6,167 | 9.875 | 1,340 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 25, 1999 | Jun 1, 1999 | — |
| 00 | Sep 16, 1999 | — | — |
| 00 | Oct 23, 1990 | Jul 25, 1990 | Yes |
| 00 | Sep 5, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32544 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32544 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932544, documented in the API reference.