WELL · 42-239-32582 · DISTRICT 2
Dittrich A.L. et AL #1
Jackson County · H. Thomas (Catahoula 2800) field · Vertical
Dittrich A.L. ET AL #1 (API 42-239-32582) is a plugged well in Jackson County, plugged January 29, 2018, last operated by Eagle Energy Development CO.
The RRC has issued one drilling permit, issued February 12, 1991, permitted to 3,500 ft.
It was permitted by Energy Development Corp. and has since transferred to Eagle Energy Development CO on the wellbore schedule.
Completion filings report one formation top, including Catahoula.
Operator of record
Permitted by Energy Development Corp.; the EWA schedule now lists a different operator.
LA Porte, TX · P-5 Y, filed Jul 8, 2022 · 1 permits on file · (713) 816-7573
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagle Energy Development Co |
| Production reports | Eagle Energy Development Cothrough Mar 2010 |
| Latest permit | Energy Development Corp.Feb 12, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- Feb 12, 1991
- last permit issued
- Mar 6, 1991
- completed
- 0
- cumulative oil, bbl
- 208K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 6, 1991
- Shut in
- —
- Plugged
- Jan 29, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dittrich, A.L. et AL G-2-137991 | H. Thomas (Catahoula 2800) | Eagle Energy Development Co | 1 | 0 | 208K | Jan 1993 – Jan 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Energy Development Corp.Jan 1993 → Oct 1996
- 2Xeric Oil & Gas CorporationNov 1996 → Jul 2004
- 3Eagle Energy Development CoAug 2004 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 384332-99 | Drill | Energy Development Corp. | Feb 6, 1991 | Feb 12, 1991 | Feb 23, 1991 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-137991 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 112 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Catahoula | 2,820 | -2,708 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,820 | 2,848 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,550 | 12.25 | 765 S |
| 5.5 | 3,251 | 7.875 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 5, 1991 | Apr 17, 1991 | Yes |
| 00 | May 7, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32582 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32582 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932582, documented in the API reference.