WELL · 42-239-32792 · DISTRICT 2

Stafford #1

Plugged

Jackson County · Kubenka (2600) field  · Vertical

Stafford #1 (API 42-239-32792) is a plugged well in Jackson County, plugged August 21, 1997, last operated by Hunt WM. Herbert Trust Est..

The RRC has issued one drilling permit, issued June 6, 1994, permitted to 3,000 ft.

It was permitted by Armour Resource Holdings, Ltd. and has since transferred to Hunt WM. Herbert Trust Est. on the wellbore schedule.

Completion filings report one formation top, including Catahoula.

Operator of record

Hunt Wm. Herbert Trust Est.

Permitted by Armour Resource Holdings, Ltd.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Mar 1, 2002 · 61 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHunt Wm. Herbert Trust Est.
Production reportsHunt, Wm. Herbert, Trust Est.through Dec 1996
Latest permitArmour Resource Holdings, Ltd.Jun 6, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Jun 6, 1994
last permit issued
Jun 30, 1994
completed
0
cumulative oil, bbl
115K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1994 THROUGH Aug 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 30, 1994
Shut in
—
Plugged
Aug 21, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stafford G-2-150968Kubenka (2600)Hunt, Wm. Herbert, Trust Est.10115KJun 1994 – Aug 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Armour Resource Holdings, Ltd.Jun 1994 → Jun 1994
  2. 2Shanghai Energy CorporationAug 1994 → Apr 1995
  3. 3Hunt, Wm. Herbert, Trust Est.May 1995 → Dec 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
424537-99DrillArmour Resource Holdings, Ltd.Jun 3, 1994Jun 6, 1994Jun 22, 19943,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-150968————

Formation tops

As filed on W-2/G-1. Subsea from 126 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula2,800-2,674

Perforations

Perforated and open-hole intervals.

FromToType
2,6182,628Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625300—160 S
4.52,9467.875675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 29, 1994Aug 12, 1994Yes
00Sep 28, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23932792, documented in the API reference.