WELL · 42-239-32827 · DISTRICT 2
Turk Farley B. et. Al. #1
Jackson County · Farley Turk (3800) field · Vertical
Turk Farley B. ET. AL. #1 (API 42-239-32827) is a plugged well in Jackson County, plugged October 31, 2011, last operated by Magnum Engineering Company.
The RRC has issued one drilling permit, issued October 3, 1994, permitted to 4,500 ft.
It was permitted by Everest Minerals Corp. and has since transferred to Magnum Engineering Company on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by Everest Minerals Corp.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Nov 4, 2025 · 13 permits on file · (361) 446-2414
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Magnum Engineering Company |
| Production reports | Magnum Engineering Companythrough Mar 1996 |
| Latest permit | Everest Minerals Corp.Oct 3, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Oct 3, 1994
- last permit issued
- Apr 18, 1995
- completed
- 0
- cumulative oil, bbl
- 12K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1995 THROUGH Oct 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 18, 1995
- Shut in
- —
- Plugged
- Oct 31, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Turk, Farley B. et. Al. G-2-154632 | Farley Turk (3800) | Magnum Engineering Company | 1 | 0 | 12K | Apr 1995 – Oct 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Everest Minerals Corp.Apr 1995 → Oct 1995
- 2Magnum Engineering CompanyMar 1996 → Mar 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 428660-99 | Drill | Everest Minerals Corp. | Sep 30, 1994 | Oct 3, 1994 | Feb 23, 1995 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-154632 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 146 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 3,800 | -3,654 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,804 | 3,806 | Perforated |
| 3,807 | 3,810 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 448 | 12.25 | 135 S |
| 2.875 | 4,340 | 7.875 | 460 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 23, 1995 | May 12, 1995 | Yes |
| 00 | Jul 13, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32827 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32827 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932827, documented in the API reference.