WELL · 42-239-32839 · DISTRICT 3
Goff JW #5
Jackson County · Lost Fork (Frio 4030) field · Vertical
Goff JW #5 (API 42-239-32839) is a plugged well in Jackson County, plugged December 31, 2001, last operated by Glenn Wayne E. & Assoc. Inc..
The RRC has issued one drilling permit (amended once), issued December 28, 1994, permitted to 5,000 ft.
It was permitted by United Oil & Minerals, Inc. and has since transferred to Glenn Wayne E. & Assoc. Inc. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by United Oil & Minerals, Inc.; the EWA schedule now lists a different operator.
Dickinson, TX · P-5 Y, filed Feb 4, 2005 · 52 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Glenn Wayne E. & Assoc. Inc. |
| Production reports | Glenn, Wayne E. & Assoc., Inc.through Jul 1997 |
| Latest permit | United Oil & Minerals, Inc.Dec 28, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 2
- permits on file
- Dec 28, 1994
- last permit issued
- May 4, 1995
- completed
- 0
- cumulative oil, bbl
- 38.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Dec 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 4, 1995
- Shut in
- —
- Plugged
- Dec 31, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goff, JW G-3-155975 | Lost Fork (Frio 4030) | Glenn, Wayne E. & Assoc., Inc. | 1 | 0 | 38.8K | May 1995 – Dec 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1United Oil & Minerals, Inc.Jul 1995 → May 1997
- 2Glenn, Wayne E. & Assoc., Inc.Jul 1997 → Jul 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 431409-98 | Drill | United Oil & Minerals, Inc. | Oct 25, 1995 | Dec 28, 1994 | — | 5,000 |
| 431409-99 | Drill | United Oil & Minerals, Inc. | Dec 29, 1994 | Dec 28, 1994 | Apr 26, 1995 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-155975 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 112 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 3,250 | -3,138 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,010 | 4,012 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 502 | 12.25 | 245 S |
| 2.875 | 4,359 | 7.875 | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 4, 1996 | Jul 24, 1995 | Yes |
| 00 | Nov 28, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32839 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32839 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932839, documented in the API reference.