WELL · 42-239-32887 · DISTRICT 2

Vance-Glaze Unit #1

Plugged

Jackson County · Toro Grande N.E. (9300 Sd.) field  · Directional · Sidetrack

Vance-Glaze Unit #1 (API 42-239-32887) is a plugged well in Jackson County, plugged April 5, 2001, last operated by Pure Resources L.P..

The RRC has issued 2 drilling permits (amended 3 times) between 1995 and 1996, permitted to 10,500 ft.

It was permitted by Brayton Operating Corp. and has since transferred to Pure Resources L.P. on the wellbore schedule.

Completion filings report 4 formation tops, including Ey-1, Yegua, Ey-2, Ay-1.

Operator of record

Pure Resources L.P.

Permitted by Brayton Operating Corp.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Feb 8, 2008 · 627 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePure Resources L.P.
Production reportsPure Resources, L.P.through Jan 2001
Latest permitBrayton Operating Corp.Oct 1, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
5
permits on file
Oct 1, 1996
last permit issued
Nov 6, 1996
completed
0
cumulative oil, bbl
665K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Aug 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 6, 1996
Shut in
—
Plugged
Apr 5, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vance-Glaze Unit G-2-162747Toro Grande, N.E. (9300 Sd.)Pure Resources, L.P.10665KNov 1996 – Aug 2002
Vance-Glaze Unit G-2-161402WildcatBrayton Operating Corp.100Jan 1996 – Nov 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brayton Operating Corp.Nov 1996 → Oct 1999
  2. 2Titan Resources I, Inc.Nov 1999 → May 2000
  3. 3Pure Resources, L.P.Jun 2000 → Jan 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
453324-98Recompletion · sidetrackBrayton Operating Corp.Nov 25, 1996Oct 1, 1996—10,500
453324-99Recompletion · sidetrackBrayton Operating Corp.Oct 1, 1996Oct 1, 1996Nov 2, 199610,500
442799-97DrillBrayton Operating Corp.Jan 18, 1996Dec 13, 1995—9,850
442799-98Drill · sidetrackBrayton Operating Corp.Jan 3, 1996Dec 13, 1995—9,850
442799-99DrillBrayton Operating Corp.Dec 13, 1995Dec 13, 1995Dec 15, 19959,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-161402————
—— G-2-162747————

Formation tops

As filed on W-2/G-1. Subsea from 72 ft elevation.Download CSV →

FormationMD ftSubsea
EY-18,065-7,993
YeguaYEGUA EY-18,065-7,993
EY-28,255-8,183
AY-19,052-8,980

Perforations

Perforated and open-hole intervals.

FromToType
9,7509,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,65614.75945 S
7.6256,2009.875333 S
4.59,9006.75825 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 27, 1997Nov 25, 1996—
00Jun 2, 1997Feb 12, 1996Yes
00May 9, 1997——
00Feb 7, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.