WELL · 42-239-32905 · DISTRICT 2

Robinson Ranch - Rob #3

Plugged

Jackson County · McDaniel (3100) field  · Vertical

Robinson Ranch - Rob #3 (API 42-239-32905) is a plugged well in Jackson County, plugged August 17, 1999, last operated by Allegro Investments Inc..

The RRC has issued one drilling permit (amended once), issued April 15, 1996, permitted to 5,000 ft.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Cordele, Catahoula.

Operator of record

Allegro Investments Inc.

Victoria, TX · P-5 Y, filed Oct 2, 2020 · 298 permits on file · (361) 573-5619

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAllegro Investments Inc.
Production reportsAllegro Investments, Inc.through Sep 1997
Latest permitAllegro Investments, Inc.Apr 15, 1996
5,000
total depth, ft
2
permits on file
Apr 15, 1996
last permit issued
May 22, 1996
completed
0
cumulative oil, bbl
85.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Aug 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 22, 1996
Shut in
—
Plugged
Aug 17, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Robinson Ranch - Rob G-2-158898McDaniel (3100)Allegro Investments, Inc.1085.7KMay 1996 – Aug 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Allegro Investments, Inc.May 1996 → Sep 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446964-98DrillAllegro Investments, Inc.Jun 12, 1996Apr 15, 1996—5,000
446964-99DrillAllegro Investments, Inc.Apr 15, 1996Apr 15, 1996May 6, 19965,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-158898————

Formation tops

As filed on W-2/G-1. Subsea from 100 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)BASE OF MIOCENE1,920-1,820
Cordele2,150-2,050
Catahoula2,650-2,550

Perforations

Perforated and open-hole intervals.

FromToType
3,0243,026Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,73012.25411 S
2.8753,1607.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 29, 1996Jun 13, 1996Yes
00Jul 15, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23932905, documented in the API reference.