WELL · 42-239-32921 · DISTRICT 2

Ploeger Dorothy #1

Plugged

Jackson County · Morales N. (9250) field  · Vertical

Ploeger Dorothy #1 (API 42-239-32921) is a plugged well in Jackson County, plugged September 9, 2010, last operated by Acock/Anaqua Operating CO. LP.

The RRC has issued 2 drilling permits (amended once) between 1996 and 1998, permitted to 15,500 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Acock/Anaqua Operating CO. LP on the wellbore schedule.

Completion filings report 3 formation tops, including Frio, Cockfield, Wilcox.

Operator of record

Acock/Anaqua Operating Co. LP

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Corpus Christ, TX · P-5 Y, filed Jan 4, 2026 · 288 permits on file · (361) 876-5691

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAcock/Anaqua Operating Co. LP
Production reportsAcock Operating Limitedthrough Nov 2008
Latest permitTranstexas Gas CorporationAug 12, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,500
total depth, ft
3
permits on file
Aug 12, 1998
last permit issued
Aug 8, 1998
completed
0
cumulative oil, bbl
1.45M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH Sep 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 8, 1998
Shut in
—
Plugged
Sep 9, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ploeger, Dorothy G-2-170694Morales, N. (9250)Acock/Anaqua Operating Co., LP101.29MAug 1998 – Sep 2010
Ploeger, Dorothy G-2-162012Morales, North (Wilcox)Transtexas Gas Corporation10163KDec 1996 – Aug 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationDec 1996 → Nov 1998
  2. 2Prolithic Energy Company, L.P.Dec 1998 → Jul 2002
  3. 3Acock/Anaqua Operating Co., LCAug 2002 → Apr 2004
  4. 4Acock/Anaqua Operating Co., LPMay 2004 → Dec 2005
  5. 5Acock Operating LimitedJan 2006 → Nov 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
478696-99RecompletionTranstexas Gas CorporationAug 12, 1998Aug 12, 1998Jul 24, 199815,500
451699-98DrillTranstexas Gas CorporationSep 17, 1996Aug 20, 1996—15,500
451699-99DrillTranstexas Gas CorporationAug 20, 1996Aug 20, 1996Aug 24, 199612,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-162012————
—— G-2-170694————

Formation tops

As filed on W-2/G-1. Subsea from 134 ft elevation.Download CSV →

FormationMD ftSubsea
Frio2,580-2,446
Cockfield5,625-5,491
WilcoxTOP WILCOX9,050-8,916

Perforations

Perforated and open-hole intervals.

FromToType
9,1809,185Perforated
9,1909,194Perforated
15,13615,211Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,70012.25605 S
79,6138.75435 S
3.513,312——
2.87515,4236.5150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 27, 1999Sep 3, 1998Yes
00Nov 12, 1998——
00Jun 2, 1997Jan 7, 1997Yes
00Mar 17, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23932921, documented in the API reference.