WELL · 42-239-32987 · DISTRICT 2
O Connor-Miller #2
Jackson County · EL Toro Max (AY-3 Seg B) field · Vertical
O Connor-Miller #2 (API 42-239-32987) is a plugged well in Jackson County, plugged October 26, 2007, last operated by Chevron Midcontinent L.P..
The RRC has issued one drilling permit, issued February 9, 1998, permitted to 12,000 ft.
It was permitted by Brayton Operating Corp. and has since transferred to Chevron Midcontinent L.P. on the wellbore schedule.
Completion filings report 2 formation tops, including Frio, Yegua.
Its lease has reported 201K barrels of oil and 1.2M mcf of gas since March 1998, last reporting in November 2007.
Operator of record
Permitted by Brayton Operating Corp.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Jan 4, 2026 · 173 permits on file · (800) 231-0623
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chevron Midcontinent L.P. |
| Production reports | Chevron Midcontinent, L.P.through Feb 2007 |
| Latest permit | Brayton Operating Corp.Feb 9, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- Feb 9, 1998
- last permit issued
- Mar 26, 1998
- completed
- 201K
- cumulative oil, bbl
- 1.2M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Nov 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 26, 1998
- Shut in
- —
- Plugged
- Oct 26, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| O'Connor-Miller O-2-8372 | EL Toro Max (AY-3 Seg B) | Chevron Midcontinent, L.P. | 1 | 201K | 1.2M | Mar 1998 – Nov 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brayton Operating Corp.Mar 1998 → Oct 1999
- 2Titan Resources I, Inc.Nov 1999 → May 2000
- 3Pure Resources, L.P.Jun 2000 → Mar 2006
- 4Chevron Midcontinent, L.P.Apr 2006 → Jun 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 473136-99 | Drill | Brayton Operating Corp. | Feb 9, 1998 | Feb 9, 1998 | Feb 20, 1998 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-8372 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 57 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,820 | 10,849 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,533 | 14.75 | 1,556 S |
| 7.625 | 6,697 | 9.875 | 527 S |
| 4.5 | 11,049 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 22, 1998 | Apr 8, 1998 | Yes |
| 00 | Jun 2, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32987 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32987 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932987, documented in the API reference.