WELL · 42-239-32989 · DISTRICT 2
Robinson Ranch - Rob #13
Jackson County · McDaniel (3830) field · Vertical
Robinson Ranch - Rob #13 (API 42-239-32989) is a plugged well in Jackson County, plugged March 26, 2003, last operated by Victoria Operating Inc..
The RRC has issued one drilling permit (amended once), issued March 3, 1998, permitted to 5,000 ft.
It was permitted by Trump Energy and has since transferred to Victoria Operating Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Permitted by Trump Energy; the EWA schedule now lists a different operator.
Victoria, TX · P-5 Y, filed Sep 4, 2025 · 51 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Victoria Operating Inc. |
| Production reports | Victoria Operating, Inc.through Apr 2002 |
| Latest permit | Trump EnergyMar 3, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 2
- permits on file
- Mar 3, 1998
- last permit issued
- Mar 31, 1998
- completed
- 0
- cumulative oil, bbl
- 65.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Mar 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 31, 1998
- Shut in
- —
- Plugged
- Mar 26, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Robinson Ranch - Rob G-2-171780 | McDaniel (3830) | Victoria Operating, Inc. | 1 | 0 | 65.6K | Mar 1998 – Mar 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trump EnergyApr 1998 → Nov 1998
- 2Victoria Operating, Inc.Dec 1998 → Apr 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 473943-98 | Drill | Trump Energy | Jun 11, 1998 | Mar 3, 1998 | Mar 25, 1998 | 3,865 |
| 473943-99 | Drill | Trump Energy | Mar 3, 1998 | Mar 3, 1998 | — | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-171780 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 99 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,920 | -1,821 |
| Frio | 3,559 | -3,460 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,826 | 3,827 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,618 | 12.25 | 615 S |
| 2.875 | 3,865 | 7.875 | 370 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1999 | Jan 22, 1999 | Yes |
| 00 | Feb 12, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32989 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32989 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932989, documented in the API reference.