WELL · 42-239-33339 · DISTRICT 2

Long Unit #1

Plugged

Jackson County · Largo Navidad (6560) field  · Vertical

Long Unit #1 (API 42-239-33339) is a plugged well in Jackson County, plugged February 4, 2010, last operated by Tri-C Resources LLC.

The RRC has issued one drilling permit (amended once), issued October 12, 2005, permitted to 7,700 ft.

It was permitted by Tri-C Resources, Inc. and has since transferred to Tri-C Resources LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Frio, Yegua.

Operator of record

Tri-C Resources LLC

Permitted by Tri-C Resources, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 4, 2026 · 45 permits on file · (713) 724-9532

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTri-C Resources LLC
Production reportsTri-C Resources, LLCthrough Oct 2009
Latest permitTri-C Resources, Inc.Oct 12, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,700
total depth, ft
2
permits on file
Oct 12, 2005
last permit issued
Feb 27, 2006
completed
0
cumulative oil, bbl
485K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Feb 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 27, 2006
Shut in
—
Plugged
Feb 4, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Long Unit G-2-220049Largo Navidad (6560)Tri-C Resources, LLC10485KFeb 2006 – Feb 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tri-C Resources, Inc.Feb 2006 → Jun 2009
  2. 2Tri-C Resources, LLCJul 2009 → Oct 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
607800-98DrillTri-C Resources, Inc.Nov 2, 2005Oct 12, 2005—7,700
607800-99DrillTri-C Resources, Inc.Oct 12, 2005Oct 12, 2005Nov 16, 20056,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-220049————

Formation tops

As filed on W-2/G-1. Subsea from 93 ft elevation.Download CSV →

FormationMD ftSubsea
FrioTOP OF FRIO3,190-3,097
YeguaTOP OF YEGUA6,330-6,237

Perforations

Perforated and open-hole intervals.

FromToType
6,5676,572Perforated
6,5756,577Perforated
6,5826,592Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,65013.5735 S
75,9008.75347 S
2.8757,7006.125480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2007Mar 13, 2006Yes
00Oct 12, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23933339, documented in the API reference.