WELL · 42-239-33430 · DISTRICT 2

Ohlendorf #1

Plugged

Jackson County · LA Salle (6100) field  · Vertical

Ohlendorf #1 (API 42-239-33430) is a plugged well in Jackson County, plugged December 17, 2012, last operated by Acock/Anaqua Operating CO. LP.

The RRC has issued one drilling permit, issued October 3, 2007, permitted to 7,600 ft.

Completion filings report one formation top, including Frio.

Operator of record

Acock/Anaqua Operating Co. LP

Corpus Christ, TX · P-5 Y, filed Jan 4, 2026 · 288 permits on file · (361) 876-5691

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAcock/Anaqua Operating Co. LP
Production reportsAcock/Anaqua Operating Co., LPthrough Nov 2010
Latest permitAcock/Anaqua Operating Co., LPOct 3, 2007
7,600
total depth, ft
1
permits on file
Oct 3, 2007
last permit issued
Nov 21, 2007
completed
0
cumulative oil, bbl
372K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Dec 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 21, 2007
Shut in
—
Plugged
Dec 17, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ohlendorf G-2-232899LA Salle (6100)Acock/Anaqua Operating Co., LP10372KNov 2007 – Dec 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Acock/Anaqua Operating Co., LPNov 2007 → Nov 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
646877-99DrillAcock/Anaqua Operating Co., LPSep 27, 2007Oct 3, 2007Oct 27, 20077,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-232899————

Formation tops

As filed on W-2/G-1. Subsea from 36 ft elevation.Download CSV →

FormationMD ftSubsea
Frio6,300-6,264

Perforations

Perforated and open-hole intervals.

FromToType
6,3006,304Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,51312.5480 S
4.56,8707.875725 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 5, 2008Jan 24, 2008Yes
00Feb 8, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23933430, documented in the API reference.