WELL · 42-239-33509 · DISTRICT 2
L Ranch D #2
Jackson County · South la Ward (Clements B Sand) field · Vertical
L Ranch D #2 (API 42-239-33509) is a well in Jackson County operated by Ginger Oil Company (A), completed July 14, 2009.
The RRC has issued 2 drilling permits (amended once) between 2009 and 2010, permitted to 8,700 ft.
Its 2 leases have reported 206K barrels of oil and 171K mcf of gas since October 2008, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
The Woodlands, TX · P-5 Y, filed Jan 8, 2016 · 10 permits on file · (281) 681-8600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ginger Oil Company (A) |
| Production reports | Wagner Oil Companythrough Feb 2023 |
| Latest permit | Ginger Oil Company (A)Jun 23, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,700
- total depth, ft
- 3
- permits on file
- Jun 23, 2010
- last permit issued
- Jul 14, 2009
- completed
- 206K
- cumulative oil, bbl
- 171K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 14, 2009
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| L Ranch D Unit O-2-9412 | South la Ward (8,000 Upper) | Wagner Oil Company | 2 | 155K | 163K | Feb 2010 – Jul 2026 |
| L Ranch D O-2-9278 | South la Ward (Clements B Sand) | Ginger Oil Company (A) | 2 | 50.9K | 8.13K | Oct 2008 – Jun 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ginger Oil Company (A)Oct 2008 → Jan 2016
- 2White Oak Operating Company LLCFeb 2016 → Jul 2019
- 3Wagner Oil CompanyNov 2019 → Feb 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 697861-99 | Recompletion | Ginger Oil Company (A) | Jun 18, 2010 | Jun 23, 2010 | Feb 19, 2010 | 8,420 |
| 681133-98 | Drill | Ginger Oil Company (A) | Jul 10, 2009 | May 11, 2009 | Jun 8, 2009 | 8,700 |
| 681133-99 | Drill | Ginger Oil Company (A) | May 8, 2009 | May 11, 2009 | Jun 8, 2009 | 8,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-9278 | — | — | — | — |
| — | — O-2-9412 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,918 | 7,923 | Perforated |
| 8,464 | 8,467 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,020 | 12.25 | 545 S |
| 4.5 | 8,600 | 8.75 | 635 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 2010 | Mar 18, 2010 | Yes |
| 00 | Jun 24, 2010 | — | — |
| 00 | May 26, 2010 | Aug 3, 2009 | Yes |
| 00 | Mar 17, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-33509 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-33509 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23933509, documented in the API reference.