WELL · 42-239-33766 · DISTRICT 2

West Ranch (41-a/98-a Cons) Unit #1076

Y

Jackson County · West Ranch (41-a & 98-a Cons.) field · Injection  · Directional

West Ranch (41-A/98-A Cons) Unit #1076 (API 42-239-33766) is a well in Jackson County operated by Hilcorp Energy Company, completed June 1, 2024 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued April 25, 2016, permitted to 7,200 ft.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta - Disposal.

Its lease has reported 9.11M barrels of oil and 7.69K mcf of gas since July 2016, last reporting in July 2026. The lease carries 253 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 36.4K barrels injected in the 12 months reported through May 2025.

Operator of record

Hilcorp Energy Company

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyApr 25, 2016
7,200
total depth, ft
1
permits on file
Apr 25, 2016
last permit issued
Jun 1, 2024
completed
9.11M
cumulative oil, bbl
7.69K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 1, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 253 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch (41-a/98-a Cons) Unit O-2-11296West Ranch (41-a & 98-a Cons.)Hilcorp Energy Company2539.11M7.69KJul 2016 – Jul 2026

Oil, barrels lease total

Last 12 months 784,079 · prior 12 878,766(-11%)

050K100K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hilcorp Energy CompanyJul 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
815188-99DrillHilcorp Energy CompanyApr 21, 2016Apr 25, 2016Mar 15, 20177,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-11296————

Formation tops

As filed on W-2/G-1. Subsea from 26 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaCATAHOULA - DISPOSAL, H2S (CORDE4,261-4,235
CatahoulaCATAHOULA - DISPOSAL, H2S (CORDE4,320-4,294
FrioFRIO - DISPOSAL5,000-4,974
FrioFRIO - DISPOSAL5,025-4,999
Gretta - Disposal5,102-5,076
Gretta - Disposal5,115-5,089

Perforations

Perforated and open-hole intervals.

FromToType
6,2126,227Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,32213.51,100 S
76,5229.8751,510 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 2025Nov 4, 2024—
00Oct 23, 2019Jul 12, 2019—
00Oct 1, 2018Sep 28, 2018—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

36.4K
bbl, last 12 reported months
4.41M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114385H-1 InjectionActive20,0002,8755,700–6,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 36,423 · prior 12 1,155,101(-97%)

0100K200K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23933766, documented in the API reference.