WELL · 42-241-30120 · DISTRICT 3
Castillo, Arco #3
Jasper County · Castillo (Yegua #11) field · Vertical
Castillo, Arco #3 (API 42-241-30120) is a plugged well in Jasper County, plugged March 29, 1992, last operated by MK Oil And Gas Inc..
The RRC has issued 2 drilling permits between 1982 and 2002, permitted to 8,200 ft.
It was permitted by Jay Management Company, LLC and has since transferred to MK Oil And Gas Inc. on the wellbore schedule.
Completion filings report one formation top, including Yegua.
Operator of record
Permitted by Jay Management Company, LLC; the EWA schedule now lists a different operator.
Unknown, XX · P-5 Y · 12 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | MK Oil and Gas Inc. |
| Production reports | Jay Management Company, LLCthrough Jun 2018 |
| Latest permit | Jay Management Company, LLCFeb 4, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,200
- total depth, ft
- 2
- permits on file
- Feb 4, 2002
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 561K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 29, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arco Castillo G-3-188250 | Castillo (Yegua #5) | Jay Management Company, LLC | 1 | 0 | 561K | Mar 2002 – Jul 2026 |
| — O-3-16163 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jay Management Company, LLCApr 2002 → Jun 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 516732-99 | Reenter | Jay Management Company, LLC | Jan 10, 2002 | Feb 4, 2002 | Mar 7, 2002 | 8,112 |
| 176865-99 | Recompletion | Hanson Minerals Co. | Nov 3, 1982 | Nov 3, 1982 | — | 8,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-188250 | — | — | — | — |
| — | — O-3-16163 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 95 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,117 | 7,120 | Perforated |
| 7,127 | 7,131 | Perforated |
| 7,260 | 7,263 | Perforated |
| 7,297 | — | Perforated |
| — | 7,553 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 537 | 12.25 | 200 S |
| 8.625 | 538 | 12.25 | 200 S |
| 2.375 | 7,143 | — | — |
| 2.375 | 7,243 | — | — |
| 4.5 | 7,978 | 7.875 | 610 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 4, 2002 | Apr 18, 2002 | — |
| 00 | May 1, 2002 | — | — |
| 00 | Jan 12, 1984 | Sep 27, 1982 | — |
| 00 | Jan 12, 1984 | Dec 30, 1975 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-241-30120 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-241-30120 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24130120, documented in the API reference.