WELL · 42-241-30125 · DISTRICT 3

Champion International #1

Plugged

Jasper County · Champion (Wilcox 8788) field  · Vertical

Champion International #1 (API 42-241-30125) is a plugged well in Jasper County, plugged July 13, 2000, last operated by Endeavor Production Company.

The RRC has issued 2 drilling permits between 1980 and 1983, permitted to 9,100 ft.

It was permitted by Kilroy Company Of Texas, Inc. and has since transferred to Endeavor Production Company on the wellbore schedule.

Operator of record

Endeavor Production Company

Permitted by Kilroy Company of Texas, Inc.; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Apr 8, 2005

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEndeavor Production Company
Production reportsnone
Latest permitKilroy Company of Texas, Inc.Oct 5, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,100
total depth, ft
2
permits on file
Oct 5, 1983
last permit issued
Jan 21, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 21, 1984
Shut in
—
Plugged
Jul 13, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Champion International O-3-17432Champion (Wilcox 8788)Endeavor Production Company100Jan 1993 – Aug 2003

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
216272-99RecompletionKilroy Company of Texas, Inc.Feb 1, 1984Oct 5, 1983—8,823
92079-99RecompletionKilroy Company of Texas, Inc.Sep 10, 1980Sep 10, 1980—9,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-17432————

Perforations

Perforated and open-hole intervals.

FromToType
8,662—Perforated
8,7068,730Perforated
8,760—Perforated
8,7888,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,300151,050 S
2.3758,589——
2.3758,685——
2.3758,747——
78,8909.875797 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 23, 1984Jan 30, 1984—
00Apr 7, 1984Jan 30, 1984—
00Jan 12, 1984Jul 15, 1981—
00Jan 12, 1984May 13, 1976—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130125, documented in the API reference.