WELL · 42-241-30298 · DISTRICT 3

Arco Castillo #6

Plugged

Jasper County · Castillo (Yegua #8-A) field  · Vertical

Arco Castillo #6 (API 42-241-30298) is a plugged well in Jasper County, plugged February 20, 1992, last operated by Hanson Minerals CO..

The RRC has issued 4 drilling permits between 1977 and 1990, permitted to 8,200 ft.

Operator of record

Hanson Minerals Co.

Houston, TX · P-5 Y, filed Feb 3, 1995 · 418 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHanson Minerals Co.
Production reportsnone
Latest permitHanson Minerals Co.Sep 11, 1990
8,200
total depth, ft
4
permits on file
Sep 11, 1990
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 20, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-3-135758——000—
— O-3-20402——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
375747-99RecompletionHanson Minerals Co.Jul 20, 1990Sep 11, 1990—8,150
357683-99RecompletionHanson Minerals Co.Apr 3, 1989Apr 4, 1989—7,237
45143-99RecompletionSouthland Drilling Co., Inc.Mar 27, 1979Mar 27, 1979—8,200
15153-99DrillSouthland Drilling Co., Inc.Dec 30, 1977Dec 30, 1977Mar 20, 19788,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-135758————
—— O-3-20402————

Perforations

Perforated and open-hole intervals.

FromToType
6,9566,963Perforated
7,2337,237Perforated
7,2897,291Perforated
7,362—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62558912.25250 S
2.3757,171——
2.3757,176——
4.57,6117.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 2, 1991Jul 20, 1990Yes
00Oct 12, 1990——
00Apr 12, 1989Apr 3, 1989Yes
00Apr 7, 1989——
00Jan 12, 1984Mar 23, 1979—
00Jan 12, 1984May 1, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130298, documented in the API reference.