WELL · 42-241-30581 · DISTRICT 3

Atlantic-Castillo #1

Plugged

Jasper County · Bessmay (Wilcox 2B) field  · Vertical

Atlantic-Castillo #1 (API 42-241-30581) is a plugged well in Jasper County, plugged June 30, 2000, last operated by Xto Energy Inc..

The RRC has issued one drilling permit (amended once), issued August 23, 1994, permitted to 3,500 ft.

It was permitted by Mcgowen Resources CO., Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report one formation top, including Miocene (undifferentiated).

Its lease has reported 16.2K barrels of oil and 98K mcf of gas since August 1993, last reporting in November 2007. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by McGowen Resources Co., Inc.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsDominion Expl. & Prod., Inc.through Feb 2005
Latest permitMcGowen Resources Co., Inc.Aug 23, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
2
permits on file
Aug 23, 1994
last permit issued
—
completed
16.2K
cumulative oil, bbl
98K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Nov 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 30, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Atlantic-Castillo O-3-22181Bessmay (Wilcox 2B)XTO Energy Inc.216.2K98KAug 1993 – Nov 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texcal Oil Inc.Aug 1993 → Mar 1994
  2. 2McGowen Resources Co., Inc.Jan 1996 → Apr 1999
  3. 3Coastal Oil & Gas CorporationNov 2000 → Jun 2001
  4. 4EL Paso Production Oil & Gas Co.Jul 2001 → Jun 2002
  5. 5Dominion Expl. & Prod., Inc.Jul 2002 → Feb 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427309-98DrillMcGowen Resources Co., Inc.Jan 23, 1995Aug 23, 1994Mar 4, 19953,500
427309-99DrillMcGowen Resources Co., Inc.Aug 23, 1994Aug 23, 1994—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22181————

Formation tops

As filed on W-2/G-1. Subsea from 85 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE2,540-2,455

Perforations

Perforated and open-hole intervals.

FromToType
3,4723,488Perforated
3,4963,532Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,43811725 S
5.53,5607.875262 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 8, 1996Jul 26, 1995—
00Oct 6, 1995—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4K
bbl, last 12 reported months
596K
bbl, all reported
Feb 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082009W-14 DisposalPlugged Jul 24, 20003,0001,5003,000–3,532

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,000 · prior 12 125,800(-97%)

05K10K15K19992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130581, documented in the API reference.