WELL · 42-241-30612 · DISTRICT 6
Arco Fee A-360 #1H
Jasper County · Brookeland (Austin Chalk 8800) field · Horizontal
Arco Fee A-360 #1H (API 42-241-30612) is a plugged horizontal well in Jasper County, plugged May 12, 2001, last operated by Rme Petroleum Company.
The RRC has issued one drilling permit (amended once), issued June 30, 1995, permitted to 16,605 ft.
It was permitted by Torch Operating Company and has since transferred to Rme Petroleum Company on the wellbore schedule.
Completion filings report one formation top, including Austin Chalk.
Operator of record
Permitted by Torch Operating Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Oct 5, 2018 · 512 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rme Petroleum Company |
| Production reports | Union Pacific Resources Companythrough Jul 2000 |
| Latest permit | Torch Operating CompanyJun 30, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,605
- total depth, ft
- 2
- permits on file
- Jun 30, 1995
- last permit issued
- Oct 31, 1995
- completed
- 0
- cumulative oil, bbl
- 1.44M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Mar 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 31, 1995
- Shut in
- —
- Plugged
- May 12, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arco Fee A-360 G-6-158205 | Brookeland (Austin Chalk, 8800) | Rme Petroleum Company | 1 | 0 | 1.44M | Oct 1995 – Mar 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Torch Operating CompanyFeb 1996 → Jun 1996
- 2Union Pacific Resources CompanyJul 1996 → Jul 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 437442-98 | Drill | Torch Operating Company | Mar 14, 1996 | Jun 30, 1995 | — | 16,605 |
| 437442-99 | Drill | Torch Operating Company | Jun 30, 1995 | Jun 30, 1995 | Sep 6, 1995 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-158205 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 207 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 10,646 | -10,439 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,696 | 14,908 | Open hole |
| 10,696 | 16,605 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | — | — |
| 10.75 | 2,015 | 14.75 | 1,400 S |
| 7.625 | 10,696 | 9.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 19, 1996 | Jul 17, 1996 | Yes |
| 00 | Jun 12, 1996 | Mar 7, 1996 | Yes |
| 00 | May 31, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-241-30612 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-241-30612 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24130612, documented in the API reference.