WELL · 42-241-30695 · DISTRICT 3

BP America (A-510) #1

Plugged

Jasper County · Wildcat field  · Directional

BP America (A-510) #1 (API 42-241-30695) is a plugged well in Jasper County, plugged May 25, 2003, last operated by Lacy Operations Ltd..

The RRC has issued one drilling permit, issued February 13, 2003, permitted to 12,100 ft.

It was permitted by Lacy Operations, Ltd. and has since transferred to Lacy Operations Ltd. on the wellbore schedule.

Operator of record

Lacy Operations Ltd.

Permitted by Lacy Operations, Ltd.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLacy Operations, Ltd.Feb 13, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,100
total depth, ft
1
permits on file
Feb 13, 2003
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 25, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
528308-99DrillLacy Operations, Ltd.Feb 10, 2003Feb 13, 2003Mar 15, 200312,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111278H-1 InjectionCanceled Apr 19, 20175,0003,5677,135–7,833

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130695, documented in the API reference.