WELL · 42-241-30778 · DISTRICT 3

BP #1

Y

Jasper County · Castillo (Yegua 6-B) field · Producing  · Vertical

BP #1 (API 42-241-30778) is a well in Jasper County operated by Shoco Production LLC, completed November 20, 2008 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 14, 2008, permitted to 8,500 ft.

It was permitted by New Century Exploration, Inc. and has since transferred to Shoco Production LLC on the wellbore schedule.

Its lease has reported 78.2K barrels of oil and 65.1K mcf of gas since November 2008, last reporting in July 2026.

Operator of record

Shoco Production LLC

Permitted by New Century Exploration, Inc.; the EWA schedule now lists a different operator.

Kilgore, TX · P-5 Y, filed Nov 4, 2025 · 2 permits on file · (903) 242-8818

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShoco Production LLC
Production reportsShoco Production LLCthrough Sep 2025
Latest permitNew Century Exploration, Inc.Oct 14, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Oct 14, 2008
last permit issued
Nov 20, 2008
completed
78.2K
cumulative oil, bbl
65.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 20, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
BP O-3-25361Castillo (Yegua 6-B)Shoco Production LLC178.2K65.1KNov 2008 – Jul 2026

Oil, barrels lease total

Last 12 months 10 · prior 12 458(-98%)

050100150202420252026

Gas, mcf lease total

Last 12 months 870 · prior 12 2,095(-58%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1New Century Exploration, Inc.Jul 2009 → Feb 2023
  2. 2Shoco Production LLCMar 2023 → Aug 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
671305-99DrillNew Century Exploration, Inc.Sep 16, 2008Oct 14, 2008Oct 31, 20088,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-25361————

Perforations

Perforated and open-hole intervals.

FromToType
7,2367,239Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,46612.251,246 S
4.57,9908.75523 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 26, 2009Jul 24, 2009Yes
00Sep 1, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130778, documented in the API reference.