WELL · 42-245-01726 · DISTRICT 3
Broussard Trust #11
Jefferson County · Vertical
Broussard Trust #11 (API 42-245-01726) is a permitted well in Jefferson County filed by Milestone Operating, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2005 and 2014, permitted to 8,000 ft.
Completion filings report 3 formation tops, including Het, Marg 2, Frio.
Its 2 leases have reported 557 barrels of oil and 2.22K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Montgomery, TX · P-5 Y, filed Dec 4, 2025 · 90 permits on file · (936) 447-1174
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Milestone Operating, Inc.through Aug 2015 |
| Latest permit | Milestone Operating, Inc.Sep 6, 2014 |
- 8,000
- total depth, ft
- 2
- permits on file
- Sep 6, 2014
- last permit issued
- —
- completed
- 557
- cumulative oil, bbl
- 2.22K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| BT-M O-3-26840 | Lovells Lake (Marg. 2) | Milestone Operating, Inc. | 1 | 557 | 2.22K | Jul 2014 – Jul 2026 |
| Lovell Lake Frio 1 G.U. G-3-40419 | Lovells Lake (Frio 1) | Milestone Operating, Inc. | 1 | 0 | 0 | Jan 1993 – Jul 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Milestone Operating, Inc.Jul 2014 → Aug 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 792578-99 | Recompletion | Milestone Operating, Inc. | Jul 25, 2014 | Sep 6, 2014 | Jun 30, 2014 | 7,913 |
| 603028-99 | Recompletion | Milestone Operating, Inc | Jul 5, 2005 | Jul 8, 2005 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-40419 | — | — | — | — |
| — | — O-3-26840 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Het | 6,320 | -6,303 |
| Marg 2 | 7,300 | -7,283 |
| FrioFRIO 1 | 7,650 | -7,633 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,312 | 7,316 | Perforated |
| 7,672 | 7,682 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,391 | 13.625 | 500 S |
| 7 | 7,732 | 9.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 21, 2015 | Nov 14, 2014 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-01726 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-01726 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24501726, documented in the API reference.