WELL · 42-245-01768 · DISTRICT 3

Jefferson Land Company #18

N

Jefferson County  · Sidetrack

Jefferson Land Company #18 (API 42-245-01768) is a permitted well in Jefferson County filed by Milestone Operating, Inc; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1977 and 2004, permitted to 7,790 ft.

Its 4 leases have reported 254K barrels of oil and 1.02M mcf of gas since January 1993, last reporting in July 2026. The leases carry 14 wells, so these are lease totals, not this well alone.

Operator of record

Milestone Operating, Inc

Montgomery, TX · P-5 Y, filed Dec 4, 2025 · 90 permits on file · (936) 447-1174

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMilestone Operating, Inc.through Mar 2026
Latest permitMilestone Operating, IncDec 28, 2004
7,790
total depth, ft
5
permits on file
Dec 28, 2004
last permit issued
—
completed
254K
cumulative oil, bbl
1.02M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jefferson Land Co. a/C #1 O-3-9043Lovells Lake (Marg. 2)Milestone Operating, Inc.11254K322KJan 1993 – Jul 2026
Jefferson Land Co. a/C 1 G-3-157556Lovells Lake (Marg. 7300)Milestone Operating, Inc.1032.6KJan 1996 – Jan 2017
Jefferson Land Co. a/C 1 G-3-146364Lovells Lake (Het)BDH Technology, Inc.10668KAug 1993 – Jan 1996
Jefferson Land Company G-3-128494Lovells Lake (Marg. 7600)BDH Technology, Inc.100Jan 1993 – Aug 1993

Oil, barrels lease total

Last 12 months 5,898 · prior 12 6,450(-9%)

05001K202420252026

Gas, mcf lease total

Last 12 months 5,114 · prior 12 5,344(-4%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BDH Technology, Inc.Jan 1993 → Dec 1995
  2. 2Dstj CorporationJan 1996 → Mar 2001
  3. 3Milestone Operating, Inc.Apr 2001 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
555365-99Recompletion · sidetrackMilestone Operating, IncDec 27, 2004Dec 28, 2004—7,790
444196-99RecompletionDstj CorporationJan 29, 1996Feb 8, 1996Dec 1, 19957,790
415520-99RecompletionBDH Technology, Inc.Aug 30, 1993Sep 1, 1993Jul 28, 19937,790
349884-99RecompletionChilton EnergyAug 8, 1988Aug 16, 1988—7,790
5487-99RecompletionExxon Corp.Aug 16, 1977Aug 16, 1977—7,790

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-128494————
—— G-3-146364————
—— G-3-157556————
—— O-3-9043————

Perforations

Perforated and open-hole intervals.

FromToType
6,7786,783Perforated
6,7886,792Perforated
7,2217,224Perforated
7,2387,242Perforated
7,5287,540Perforated
—7,280Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,11112.25325 S
9.6251,111——
5.57,7858.75300 S
5.57,785——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 13, 1996Jan 9, 1996Yes
00Apr 11, 1996——
00Oct 15, 1993Aug 30, 1993Yes
00Sep 8, 1993——
00Nov 3, 1988Sep 28, 1988—
00Oct 28, 1988——
00Oct 21, 1988——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24501768, documented in the API reference.