WELL · 42-245-01779 · DISTRICT 3
Jefferson Land Company #30
Jefferson County · Lovells Lake (Marg. 7600) field · Vertical
Jefferson Land Company #30 (API 42-245-01779) is a well in Jefferson County operated by Bdh Technology Inc., completed July 24, 1990.
The RRC has issued 2 drilling permits between 1990 and 1994, permitted to 7,797 ft.
No lease production has been reported under this well’s leases.
Operator of record
Conroe, TX · P-5 Y, filed Mar 22, 2001 · 20 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BDH Technology Inc. |
| Production reports | Milestone Operating, Inc.through Jul 2014 |
| Latest permit | BDH Technology, Inc.Dec 7, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,797
- total depth, ft
- 2
- permits on file
- Dec 7, 1994
- last permit issued
- Jul 24, 1990
- completed
- 0
- cumulative oil, bbl
- 402K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 1990
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lovells Lake Frio / Gas Unit G-3-72991 | Lovells Lake (Frio 1) | Milestone Operating, Inc. | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
| Jefferson Land Company G-3-152016 | Lovells Lake (Het) | Milestone Operating, Inc. | 1 | 0 | 402K | Oct 1994 – Jul 2026 |
| Jefferson Land Company G-3-135542 | Lovells Lake (Marg. 7600) | BDH Technology, Inc. | 1 | 0 | 0 | Jan 1993 – Oct 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1BDH Technology, Inc.Nov 1994 → Dec 1995
- 2Dstj CorporationJan 1996 → Mar 2001
- 3Milestone Operating, Inc.Apr 2001 → Jul 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 430657-99 | Recompletion | BDH Technology, Inc. | Dec 5, 1994 | Dec 7, 1994 | Jul 21, 1994 | 7,797 |
| 376451-99 | Recompletion | BDH Technology, Inc. | Aug 10, 1990 | Aug 30, 1990 | — | 7,797 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-72991 | — | — | — | — |
| — | — G-3-135542 | — | — | — | — |
| — | — G-3-152016 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,695 | 6,734 | Perforated |
| 7,549 | 7,560 | Perforated |
| — | 7,290 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,137 | 12.5 | 325 S |
| 3.5 | 7,298 | — | — |
| 5.5 | 7,784 | 8.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 1995 | Dec 5, 1994 | Yes |
| 00 | Dec 28, 1994 | — | — |
| 00 | Nov 28, 1990 | Aug 10, 1990 | Yes |
| 00 | Sep 6, 1990 | — | — |
| 00 | Jan 12, 1984 | Sep 28, 1977 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-01779 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-01779 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24501779, documented in the API reference.