WELL · 42-245-01787 · DISTRICT 3

Jefferson Land Company #40

N

Jefferson County  · Vertical

Jefferson Land Company #40 (API 42-245-01787) is a permitted well in Jefferson County filed by Milestone Operating, Inc.; no completion report is on file yet.

The RRC has issued 6 drilling permits between 1981 and 2008, permitted to 9,855 ft.

Its 5 leases have reported 236K barrels of oil and 1.08M mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.

Operator of record

Milestone Operating, Inc.

Montgomery, TX · P-5 Y, filed Dec 4, 2025 · 90 permits on file · (936) 447-1174

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMilestone Operating, Inc.through Mar 2026
Latest permitMilestone Operating, Inc.Sep 3, 2008
9,855
total depth, ft
6
permits on file
Sep 3, 2008
last permit issued
—
completed
236K
cumulative oil, bbl
1.08M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jefferson Land Company G-3-242398Lovells Lake(frio HACKBERRY9000)Milestone Operating, Inc.1078KAug 2008 – Jul 2026
Jefferson Land Company O-3-9052Lovells Lake (Frio 2)Milestone Operating, Inc.6236K380KJan 1993 – Jul 2026
Jefferson Land Company G-3-190567Lovells Lake (8700)Milestone Operating, Inc.10587KAug 2002 – Aug 2008
Jefferson Land Co. a/C 1 G-3-171893Lovells Lake (Marg. 7500)Milestone Operating, Inc.1036.6KOct 1998 – Aug 2002
Lovell Lake Frio 1 G. U. G-3-48241Lovells Lake (Frio 1)BDH Technology, Inc.100Jan 1993 – Apr 1994

Oil, barrels lease total

Last 12 months 2,091 · prior 12 2,297(-9%)

0200400202420252026

Gas, mcf lease total

Last 12 months 4,263 · prior 12 4,678(-9%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BDH Technology, Inc.Jan 1993 → Dec 1995
  2. 2Dstj CorporationJan 1996 → Mar 2001
  3. 3Milestone Operating, Inc.Apr 2001 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
668709-99RecompletionMilestone Operating, Inc.Aug 8, 2008Sep 3, 2008Jul 22, 20089,006
523026-99RecompletionMilestone Operating, IncAug 22, 2002Sep 3, 2002Jun 17, 20029,042
481076-99RecompletionDstj CorporationNov 23, 1998Feb 12, 1999Oct 15, 19987,861
409843-99RecompletionBDH Technology, Inc.Mar 23, 1993Mar 23, 1993Mar 30, 19939,000
263703-99RecompletionExxon Corp.Dec 21, 1984Jan 10, 1985—9,855
111042-99RecompletionExxon Corp.Mar 6, 1981Mar 6, 1981—9,855

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-48241————
—— G-3-171893————
—— G-3-190567————
—— G-3-242398————
—— O-3-9052————

Perforations

Perforated and open-hole intervals.

FromToType
7,4147,474Perforated
7,4837,488Perforated
7,5977,607Perforated
7,6147,626Perforated
7,7247,728Perforated
7,7367,746Perforated
8,7328,734Perforated
8,7428,744Perforated
8,9728,976Perforated
9,0309,040Perforated
—7,294Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
209024125 S
13.3753,005152,500 S
13.3753,00518.52,500 S
9.6257,83812.25400 S
78,9488.75225 S
5.58,9488.75225 S
79,1289225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 27, 2009Sep 2, 2008Yes
00Nov 25, 2008——
00Sep 14, 2005Jun 22, 2005—
00Oct 15, 2002Aug 30, 2002Yes
00Sep 25, 2002——
00Mar 4, 1999Nov 19, 1998Yes
00Feb 26, 1999——
00Nov 2, 1998Sep 24, 1998—
00Jul 1, 1994May 11, 1994—
00May 23, 1994——
00Jun 25, 1985Jun 4, 1985—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24501787, documented in the API reference.