WELL · 42-245-30060 · DISTRICT 3

Jefferson Land Co. a/C #1 #54

Plugged

Jefferson County · Lovells Lake (Marg. 2) field  · Vertical

Jefferson Land CO. A/C #1 #54 (API 42-245-30060) is a plugged well in Jefferson County, plugged December 19, 1980, last operated by Milestone Operating Inc..

The RRC has issued one drilling permit (amended once), issued April 9, 2003, permitted to 7,815 ft.

Completion filings report 3 formation tops, including Het, Marginulina, Frio.

Its lease has reported 254K barrels of oil and 322K mcf of gas since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 47.7K barrels injected in the 12 months reported through December 2025.

Operator of record

Milestone Operating Inc.

Montgomery, TX · P-5 Y, filed Dec 4, 2025 · 90 permits on file · (936) 447-1174

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMilestone Operating Inc.
Production reportsMilestone Operating, Inc.through Mar 2026
Latest permitMilestone Operating, IncApr 9, 2003
7,815
total depth, ft
2
permits on file
Apr 9, 2003
last permit issued
—
completed
254K
cumulative oil, bbl
322K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 19, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jefferson Land Co. a/C #1 O-3-9043Lovells Lake (Marg. 2)Milestone Operating, Inc.11254K322KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 5,898 · prior 12 6,450(-9%)

05001K202420252026

Gas, mcf lease total

Last 12 months 5,114 · prior 12 5,344(-4%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BDH Technology, Inc.Jan 1993 → Dec 1995
  2. 2Dstj CorporationJan 1996 → Mar 2001
  3. 3Milestone Operating, Inc.Apr 2001 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
529142-98ReenterMilestone Operating, IncAug 11, 2003Apr 9, 2003Jan 24, 20047,815
529142-99ReenterMilestone Operating, IncMar 4, 2003Apr 9, 2003—7,815

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-9043————

Formation tops

As filed on W-2/G-1. Subsea from 11 ft elevation.Download CSV →

FormationMD ftSubsea
Het6,700-6,689
Marginulina7,250-7,239
Frio7,650-7,639

Perforations

Perforated and open-hole intervals.

FromToType
1,2851,305Perforated
1,4381,458Perforated
1,4621,468Perforated
7,311—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,58212.25830 S
8.6251,58312.25830 S
8.6251,58312.5830 S
4.57,8157.875240 S
4.57,8167.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 18, 2024Jan 24, 2022—
00Apr 15, 2004Mar 4, 2004—
00Mar 24, 2004——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

47.7K
bbl, last 12 reported months
13.3M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092979W-14 DisposalActive5,000400800–1,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 47,728 · prior 12 74,569(-36%)

05K10K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24530060, documented in the API reference.