WELL · 42-245-31421 · DISTRICT 3

Doyle #2ST

N

Jefferson County  · Directional · Sidetrack

Doyle #2ST (API 42-245-31421) is a permitted well in Jefferson County filed by Tri-Union Development Corp.; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1980 and 2001, permitted to 15,700 ft.

Completion filings report 5 formation tops, including Miocene (undifferentiated), Frio, Vicksburg, Cockfield.

Its 2 leases have reported 105K barrels of oil and 304K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Tri-Union Development Corp.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 34 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsWagner Oil Companythrough Mar 2026
Latest permitTri-Union Development Corp.Jun 19, 2001
15,700
total depth, ft
3
permits on file
Jun 19, 2001
last permit issued
—
completed
105K
cumulative oil, bbl
304K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Doyle Gas Unit O-3-20381Constitution (13600)Wagner Oil Company1105K144KJan 1993 – Jul 2026
Doyle Gas Unit G-3-155213Constitution (13600)Apache Corporation10160KAug 1995 – Nov 1997

Oil, barrels lease total

Last 12 months 31 · prior 12 52(-40%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Aug 1994
  2. 2Apache CorporationSep 1994 → Mar 1998
  3. 3Tri-Union Development Corp.Apr 1998 → Oct 2004
  4. 4Texcal Energy (GP) LLCNov 2004 → Apr 2008
  5. 5Milagro Exploration, LLCMay 2008 → Oct 2015
  6. 6White Oak Operating Company LLCNov 2015 → Sep 2019
  7. 7Wagner Oil CompanyOct 2019 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
510475-99Recompletion · sidetrackTri-Union Development Corp.Jun 19, 2001Jun 19, 2001—14,850
245017-99RecompletionTexaco Inc.Jul 13, 1984Jul 13, 1984—14,910
91526-99DrillTexaco Inc.Aug 20, 1980Aug 20, 1980Nov 5, 198015,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-155213————
—— O-3-20381————

Formation tops

As filed on W-2/G-1. Subsea from 20 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)BASAL MIOCENE1,530-1,510
Frio5,642-5,622
Frio5,646-5,626
Vicksburg7,924-7,904
Cockfield10,782-10,762
Yegua11,454-11,434
Miocene (undifferentiated)BASAL MIOCENE15,362-15,342

Perforations

Perforated and open-hole intervals.

FromToType
13,63413,644Perforated
13,63413,694Perforated
14,33814,342Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,51717.53,000 S
9.62510,50012.25930 S
2.87514,260——
5.514,9106.5260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 13, 1997Sep 8, 1997—
00Nov 7, 1995Aug 10, 1995—
00Sep 11, 1995——
00Apr 7, 1989Mar 3, 1989—
00Mar 15, 1989——
00Nov 6, 1984Sep 11, 1984—
00Oct 2, 1984Aug 31, 1984—
00Jan 12, 1984Feb 25, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24531421, documented in the API reference.