WELL · 42-245-31790 · DISTRICT 3

HMC/HNG Crow #1

Plugged

Jefferson County · Big Hill (Frio 10 400) field  · Vertical

Hmc/Hng Crow #1 (API 42-245-31790) is a plugged well in Jefferson County, plugged May 22, 2025, last operated by Petrotex Engineering Company.

The RRC has issued 2 drilling permits (amended once) between 1984 and 1991, permitted to 13,250 ft.

Completion filings report 4 formation tops, including Top Of Marginulina, Top Of Lower Marginulina, Top Of Nonion Struma, Topof Nonion Struma.

Operator of record

Petrotex Engineering Company

Cypress, TX · P-5 Y, filed Jul 4, 2026 · 4 permits on file · (281) 221-0135

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetrotex Engineering Company
Production reportsC/A Limitedthrough Sep 1996
Latest permitPetrotex Engineering CompanyJun 17, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,250
total depth, ft
3
permits on file
Jun 17, 1991
last permit issued
Jul 29, 1992
completed
0
cumulative oil, bbl
65.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 29, 1992
Shut in
—
Plugged
May 22, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
HMC/HNG Crow G-3-115113Big Hill (Nonion Struma Sd.)Petrotex Engineering Company100Jan 1993 – Jul 2026
HMC/HNG Crow G-3-141551Big Hill (Frio 10,400)Petrotex Engineering Company1065.1KJan 1993 – May 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Petrotex Engineering CompanyJan 1993 → Mar 1994
  2. 2C/A LimitedApr 1994 → Sep 1996
  3. 3Chartex Petroleum CompanyJan 1996 → Mar 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
388731-98OtherPetrotex Engineering CompanyMay 15, 1992Jun 17, 1991May 20, 199110,690
388731-99OtherPetrotex Engineering CompanyJun 3, 1991Jun 17, 1991—10,690
247259-99DrillHanson Minerals Co.Aug 2, 1984Aug 2, 1984—13,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-115113————
—— G-3-141551————

Formation tops

As filed on W-2/G-1. Subsea from 86 ft elevation.Download CSV →

FormationMD ftSubsea
Top of Marginulina8,360-8,274
Top of Lower Marginulina9,000-8,914
Top of Nonion Struma10,550-10,464
Topof Nonion Struma10,550-10,464

Perforations

Perforated and open-hole intervals.

FromToType
10,40210,408Perforated
10,402—Perforated
10,408—Perforated
10,42010,408Perforated
10,55210,567Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
7.6251,050——
10.752,50014.751,415 S
10.752,500——
7.62510,2509.875900 S
7.62510,250——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 16, 1992Aug 10, 1992—
00Nov 12, 1992Mar 9, 1992Yes
00Nov 10, 1992Jan 27, 1992—
00Jul 7, 1992——
00Mar 7, 1985Nov 19, 1984—
00Mar 6, 1985Oct 20, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24531790, documented in the API reference.