WELL · 42-245-31844 · DISTRICT 3
Carroll William Est. #4
Jefferson County · Bauer Ranch (6120) field · Vertical
Carroll William Est. #4 (API 42-245-31844) is a well in Jefferson County operated by S & S Operating Company Inc., completed May 3, 1985.
The RRC has issued 2 drilling permits between 1985 and 1992, permitted to 6,800 ft.
It was permitted by Puls, W. L. and has since transferred to S & S Operating Company Inc. on the wellbore schedule.
Its 2 leases have reported 79.3K barrels of oil and 193 mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Puls, W. L.; the EWA schedule now lists a different operator.
Winnie, TX · P-5 Y, filed Mar 4, 2026 · 20 permits on file · (409) 781-3057
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | S & S Operating Company Inc. |
| Production reports | S & S Operating Company, Inc.through Apr 2026 |
| Latest permit | Puls, W. L.Jun 3, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,800
- total depth, ft
- 2
- permits on file
- Jun 3, 1992
- last permit issued
- May 3, 1985
- completed
- 79.3K
- cumulative oil, bbl
- 193
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 3, 1985
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carroll, William Est. O-3-11746 | Bauer Ranch (6120) | S & S Operating Company, Inc. | 3 | 0 | 0 | Jun 1997 – Jul 2026 |
| Carroll, William Est. O-3-21490 | Bauer Ranch (6040) | S & S Operating Company, Inc. | 1 | 79.3K | 193 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,659 · prior 12 933(+185%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Puls, W. L.Jan 1993 → Sep 2002
- 2Puls Operating CompanyOct 2002 → Aug 2016
- 3Sawtooth Operating Co., Inc.Sep 2016 → Jul 2020
- 4S & S Operating Company, Inc.Sep 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 399836-99 | Recompletion | Puls, W. L. | Jun 1, 1992 | Jun 3, 1992 | May 7, 1992 | 6,703 |
| 272757-99 | Drill | Puls, W. L. | Apr 19, 1985 | Apr 19, 1985 | Apr 23, 1985 | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-11746 | — | — | — | — |
| — | — O-3-21490 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,030 | 6,033 | Perforated |
| 6,110 | 6,113 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 733 | 12.25 | 340 S |
| 5.5 | 6,381 | 7.875 | 130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 15, 1992 | May 28, 1992 | Yes |
| 00 | Jun 4, 1992 | May 16, 1985 | — |
| 00 | Jun 11, 1985 | May 16, 1985 | — |
| 00 | Jun 5, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-31844 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-31844 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.