WELL · 42-245-31983 · DISTRICT 3

Thomas E. Etal #4A

Y

Jefferson County · Fannett field · LPG Storage  · Directional

Thomas E. Etal #4A (API 42-245-31983) is a well in Jefferson County operated by Valero Terminaling & Distrib. CO, completed March 23, 2024 and listed as lpg storage on the RRC schedule.

The RRC has issued one drilling permit, issued November 8, 1989, permitted to 4,200 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Valero Terminaling & Distrib. CO on the wellbore schedule.

Completion filings report 3 formation tops, including Caprock, Salt, None.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 1.3M barrels injected in the 12 months reported through January 1993.

Operator of record

Valero Terminaling & Distrib. Co

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Jul 4, 2026 · 1 permits on file · (866) 423-0898

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleValero Terminaling & Distrib. Co
Production reportsnone
Latest permitChevron U. S. A. Inc.Nov 8, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
1
permits on file
Nov 8, 1989
last permit issued
Mar 23, 2024
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 23, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 30 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomas, E., Etal O-3-1513FannettValero Terminaling & Distrib. Co3000Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366068-99DrillChevron U. S. A. Inc.Nov 6, 1989Nov 8, 1989Nov 29, 19904,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-1513————

Formation tops

As filed on W-2/G-1. Subsea from 18 ft elevation.Download CSV →

FormationMD ftSubsea
Caprock1,159-1,141
Salt2,116-2,098
None——

Perforations

Perforated and open-hole intervals.

FromToType
2,8813,735Open hole
2,8813,737Open hole
2,8813,739Open hole
2,8813,745Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
544160150 S
42306502,129 S
301,346362,050 S
202,324263,938 S
162,881242,108 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 2, 2026Sep 1, 2026—
00Apr 25, 2024Apr 18, 2024—
00May 13, 2021May 11, 2021—
00Jul 30, 2019May 16, 2019—
00Sep 4, 1991Apr 9, 1991Yes
00Aug 28, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.3M
bbl, last 12 reported months
2.09M
bbl, all reported
Jan 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000071625UIC PermitActive198,0001,9352,881–3,745

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,302,481 · prior 12 788,066(+65%)

0200K400K600K19921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24531983, documented in the API reference.