WELL · 42-245-32255 · DISTRICT 3
Leicht Rosa #1
Jefferson County · Hildebrandt Bayou (10000 Hack) field · Directional
Leicht Rosa #1 (API 42-245-32255) is a plugged well in Jefferson County, plugged November 2, 2006, last operated by Par Minerals Corporation.
The RRC has issued one drilling permit (amended once), issued July 5, 2000, permitted to 11,500 ft.
It was permitted by Helmerich & Payne, Inc. and has since transferred to Par Minerals Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Marg, Frio, Hackberry.
Operator of record
Permitted by Helmerich & Payne, Inc.; the EWA schedule now lists a different operator.
Shreveport, LA · P-5 Y, filed Mar 4, 2026 · 99 permits on file · (318) 470-1110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Par Minerals Corporation |
| Production reports | Par Minerals Corporationthrough May 2004 |
| Latest permit | Helmerich & Payne, Inc.Jul 5, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 2
- permits on file
- Jul 5, 2000
- last permit issued
- Sep 13, 2000
- completed
- 0
- cumulative oil, bbl
- 1.59M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Sep 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 13, 2000
- Shut in
- —
- Plugged
- Nov 2, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Leicht, Rosa G-3-181685 | Hildebrandt Bayou (10000 Hack) | Par Minerals Corporation | 1 | 0 | 1.59M | Sep 2000 – Sep 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Helmerich & Payne, Inc.Sep 2000 → Sep 2002
- 2Cimarex Energy Co.Oct 2002 → Oct 2002
- 3Par Minerals CorporationJul 2003 → May 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 496837-98 | Drill | Helmerich & Payne, Inc. | Oct 19, 2000 | Jul 5, 2000 | — | 11,300 |
| 496837-99 | Drill | Helmerich & Payne, Inc. | Jul 3, 2000 | Jul 5, 2000 | Jul 12, 2000 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-181685 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marg | 8,220 | -8,197 |
| Frio | 8,605 | -8,582 |
| Hackberry | 10,280 | -10,257 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,922 | 10,946 | Perforated |
| 10,956 | 10,963 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,450 | 13.5 | 1,750 S |
| 7.625 | 9,200 | 9.875 | 550 S |
| 3.5 | 11,287 | 4.5 | 210 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 7, 2001 | Oct 18, 2000 | Yes |
| 00 | Apr 6, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32255 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32255 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532255, documented in the API reference.