WELL · 42-245-32314 · DISTRICT 3

Friendship #1

Plugged

Jefferson County · Devil (Frio) field  · Directional

Friendship #1 (API 42-245-32314) is a plugged well in Jefferson County, plugged August 3, 2022, last operated by Cimarex Energy CO..

The RRC has issued 4 drilling permits (amended twice) between 2002 and 2008, permitted to 13,000 ft.

Completion filings report 3 formation tops, including Frio, Hackberry, Discorbis 2.

Operator of record

Cimarex Energy Co.

Midland, TX · P-5 Y, filed Apr 4, 2026 · 2,082 permits on file · (800) 969-4789

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCimarex Energy Co.
Production reportsCimarex Energy Co.through Oct 2007
Latest permitCimarex Energy Co.Apr 8, 2008
13,000
total depth, ft
6
permits on file
Apr 8, 2008
last permit issued
Feb 25, 2004
completed
0
cumulative oil, bbl
1.99M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2004 THROUGH Jul 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 2004
Shut in
—
Plugged
Aug 3, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Friendship #3 Marg Vag G-3-260053Big Hill (Marginulina 9200)Magnum Producing, LP100Jun 2009 – Jul 2022
Friendship No. 3 Oil Unit O-3-25146Big Hill (10,000 Sand)Cimarex Energy Co.200Dec 2006 – Apr 2011
Friendship #3 Sullivan SD Gas UT G-3-259635Big Hill (Frio a 10,200)—100Apr 2009 – Sep 2009
Friendship G-3-201415Big Hill ( Hackberry Sand)Magnum Producing, LP101.43MFeb 2004 – Mar 2009
Friendship G-3-201416Devil (Frio)Cimarex Energy Co.10551KFeb 2004 – Sep 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co.Mar 2004 → Oct 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
657926-99RecompletionCimarex Energy Co.Mar 21, 2008Apr 8, 2008Apr 24, 200812,585
654164-99RecompletionCimarex Energy Co.Jan 28, 2008Feb 12, 2008Nov 27, 200712,585
622903-98RecompletionCimarex Energy Co.Nov 26, 2007Jul 24, 2006Jul 28, 200612,585
622903-99RecompletionCimarex Energy Co.Jul 20, 2006Jul 24, 2006—12,585
518870-98DrillCimarex Energy Co.Nov 4, 2003May 3, 2002Nov 12, 200313,000
518870-99DrillMagnum Producing & Operating Co.Apr 5, 2002May 3, 2002—11,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-201415————
—— G-3-201416————
—— G-3-259635————
—— G-3-260053————
—— O-3-25146————
—— O-3-25146————

Formation tops

As filed on W-2/G-1. Subsea from 11 ft elevation.Download CSV →

FormationMD ftSubsea
Frio9,760-9,749
Hackberry10,290-10,279
Discorbis 212,350-12,339

Perforations

Perforated and open-hole intervals.

FromToType
9,2849,290Perforated
10,20610,212Perforated
10,36510,378Perforated
10,38810,399Perforated
11,09411,099Perforated
12,46012,492Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,02917.53,985 S
9.62510,74112.252,010 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 22, 2011Jun 5, 2008Yes
00Jun 29, 2011——
00May 20, 2011Feb 20, 2008Yes
00Apr 25, 2011——
00Oct 7, 2008Dec 11, 2006Yes
00May 27, 2008——
00May 13, 2008——
00Jul 20, 2004Apr 14, 2004Yes
00Jun 9, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24532314, documented in the API reference.