WELL · 42-245-32319 · DISTRICT 3
L Clark et al Unit #001
Jefferson County · Directional
L Clark ET AL Unit #001 (API 42-245-32319) is a permitted well in Jefferson County filed by Karbuhn Oil Company; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended once) between 2002 and 2011, permitted to 11,410 ft.
Completion filings report 2 formation tops, including Hackberry, Top Of Hackberry.
Operator of record
Tomball, TX · P-5 Y, filed Mar 5, 2021 · 13 permits on file · (713) 252-8483
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Karbuhn Oil Companythrough Sep 2013 |
| Latest permit | Karbuhn Oil CompanyDec 13, 2011 |
- 11,410
- total depth, ft
- 4
- permits on file
- Dec 13, 2011
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.57M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2002 THROUGH Apr 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| L Clark et al Unit G-3-258377 | Hebert (H-4) | Karbuhn Oil Company | 1 | 0 | 229K | Sep 2010 – Apr 2015 |
| Clark, L. et al Unit No. 1 G-3-192893 | Hebert (H-2A) | Karbuhn Oil Company | 1 | 0 | 1.34M | Dec 2002 – Jan 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Henry Production Company, Inc.Dec 2002 → Apr 2006
- 2Karbuhn Oil CompanyAug 2006 → Sep 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 727367-99 | Recompletion | Karbuhn Oil Company | Nov 1, 2011 | Dec 13, 2011 | — | 11,100 |
| 687400-99 | Recompletion | Karbuhn Oil Company | Nov 13, 2009 | Dec 9, 2009 | May 13, 2010 | 11,100 |
| 522826-98 | Drill | Henry Production Company, Inc. | Dec 30, 2002 | Aug 16, 2002 | — | 11,410 |
| 522826-99 | Drill | Henry Production Company, Inc. | Aug 16, 2002 | Aug 16, 2002 | Oct 11, 2002 | 11,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-192893 | — | — | — | — |
| — | — G-3-258377 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hackberry | 10,560 | -10,557 |
| Top of Hackberry | 10,560 | -10,557 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,759 | 10,767 | Perforated |
| 10,922 | 10,926 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,000 | 13.5 | 1,306 S |
| 7.625 | 10,300 | 9.625 | 698 S |
| 7.625 | 10,300 | 9.875 | 698 S |
| 16 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 26, 2016 | Dec 15, 2015 | — |
| 00 | Dec 29, 2010 | Oct 2, 2010 | Yes |
| 00 | Apr 4, 2003 | Jan 13, 2003 | Yes |
| 00 | Feb 28, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32319 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32319 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532319, documented in the API reference.