WELL · 42-245-32566 · DISTRICT 3
Jefferson Land Company #61
Jefferson County · Lovells Lake N. (7800) field · Vertical
Jefferson Land Company #61 (API 42-245-32566) is a well in Jefferson County operated by Milestone Operating Inc., completed October 30, 2008.
The RRC has issued 2 drilling permits between 2008 and 2009, permitted to 9,000 ft.
Completion filings report 3 formation tops, including Het Lime, Marg., Frio.
No lease production has been reported under this well’s leases.
Operator of record
Montgomery, TX · P-5 Y, filed Dec 4, 2025 · 90 permits on file · (936) 447-1174
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Milestone Operating Inc. |
| Production reports | Milestone Operating, Inc.through Jun 2013 |
| Latest permit | Milestone Operating, Inc.Jul 10, 2009 |
- 9,000
- total depth, ft
- 2
- permits on file
- Jul 10, 2009
- last permit issued
- Oct 30, 2008
- completed
- 0
- cumulative oil, bbl
- 41.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 30, 2008
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jefferson Land Company G-3-257936 | Lovells Lake, North (F-7500 Fba) | Milestone Operating, Inc. | 1 | 0 | 36.2K | Jun 2009 – Jul 2026 |
| Jefferson Land Company G-3-247516 | Lovells Lake, N. (7800) | Milestone Operating, Inc. | 1 | 0 | 5.58K | Oct 2008 – Jun 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Milestone Operating, Inc.Oct 2008 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 682756-99 | Recompletion | Milestone Operating, Inc. | Jul 2, 2009 | Jul 10, 2009 | Jun 1, 2009 | 7,515 |
| 668705-99 | Drill | Milestone Operating, Inc. | Aug 8, 2008 | Aug 12, 2008 | Aug 22, 2008 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-247516 | — | — | — | — |
| — | — G-3-257936 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 33 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Het Lime | 6,410 | -6,377 |
| Marg. | 6,788 | -6,755 |
| Frio | 7,255 | -7,222 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,494 | 7,496 | Perforated |
| 7,970 | 7,974 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,942 | 13.5 | 1,165 S |
| 7.625 | 7,584 | 9.875 | 540 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 2011 | Jul 16, 2009 | Yes |
| 00 | Nov 10, 2010 | — | — |
| 00 | Jul 28, 2009 | Nov 14, 2008 | Yes |
| 00 | Jun 2, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32566 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32566 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532566, documented in the API reference.