WELL · 42-245-32604 · DISTRICT 3
Keeland Gas Unit #1
Jefferson County · Claude Watts (Yegua) field · Directional
Keeland Gas Unit #1 (API 42-245-32604) is a well in Jefferson County operated by Samson Exploration LLC, completed July 7, 2009.
The RRC has issued 2 drilling permits between 2009 and 2015, permitted to 14,500 ft.
Completion filings report 5 formation tops, including Oligocene, Frio, Eocene, Claiborne-Yegua.
No lease production has been reported under this well’s leases.
Operator of record
Tulsa, OK · P-5 Y, filed Oct 5, 2018 · 117 permits on file · (855) 288-2966
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Samson Exploration LLC |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Samson Exploration, LLCFeb 17, 2015 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,500
- total depth, ft
- 2
- permits on file
- Feb 17, 2015
- last permit issued
- Jul 7, 2009
- completed
- 0
- cumulative oil, bbl
- 2.97M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 7, 2009
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Keeland Gas Unit G-3-280482 | Claude Watts (Yegua 12600) | Hilcorp Energy Company | 1 | 0 | 2.24M | Sep 2014 – Jul 2026 |
| Keeland Gas Unit G-3-252413 | Claude Watts (Yegua) | Samson Exploration, LLC | 1 | 0 | 733K | Jul 2009 – Oct 2014 |
Gas, mcf lease total
Last 12 months 81,236 · prior 12 51,024(+59%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Samson Lone Star, LLCJul 2009 → Jan 2012
- 2Samson Exploration, LLCFeb 2012 → Aug 2016
- 3Hilcorp Energy CompanySep 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 803760-99 | Recompletion | Samson Exploration, LLC | Feb 12, 2015 | Feb 17, 2015 | Aug 8, 2014 | 12,999 |
| 680948-99 | Drill | Samson Lone Star, LLC | May 4, 2009 | May 5, 2009 | May 24, 2009 | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-252413 | — | — | — | — |
| — | — G-3-280482 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 37 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,553 | 12,622 | Perforated |
| 12,877 | 12,913 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,887 | 14.75 | 2,140 S |
| 7.625 | 10,457 | 9.875 | 745 S |
| 3.5 | 13,064 | 7.5 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 5, 2016 | Oct 21, 2014 | — |
| 00 | Feb 1, 2010 | Aug 6, 2009 | Yes |
| 00 | Nov 5, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32604 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32604 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532604, documented in the API reference.