WELL · 42-247-01726 · DISTRICT 4
Kenedy Foundation "B" #188
Jim Hogg County · Prado (Govt. Wells Upper) field · Vertical
Kenedy Foundation "B" #188 (API 42-247-01726) is a plugged well in Jim Hogg County, plugged July 16, 1987, last operated by Sohio Petroleum CO..
The RRC has issued one drilling permit, issued January 21, 1993, permitted to 3,850 ft.
It was permitted by PI Energy, Inc. and has since transferred to Sohio Petroleum CO. on the wellbore schedule.
Its lease has reported 657 barrels of oil and 269 mcf of gas since February 1993, last reporting in August 2003.
Operator of record
Permitted by PI Energy, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Aug 15, 1986 · 234 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sohio Petroleum Co. |
| Production reports | 39 Crude, L.C.through Nov 1993 |
| Latest permit | PI Energy, Inc.Jan 21, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,850
- total depth, ft
- 1
- permits on file
- Jan 21, 1993
- last permit issued
- Oct 1, 1963
- completed
- 657
- cumulative oil, bbl
- 269
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 1, 1963
- Shut in
- —
- Plugged
- Jul 16, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| K.M.F. "B" O-4-12164 | Prado (Combined Zones) | Owl Creek Production Co., Inc. | 1 | 657 | 269 | Feb 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1PI Energy, Inc.Feb 1993 → Oct 1993
- 239 Crude, L.C.Nov 1993 → Nov 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 408344-99 | Reenter | PI Energy, Inc. | Jan 21, 1993 | Jan 21, 1993 | Jan 11, 1993 | 3,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-12164 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,504 | 3,513 | Perforated |
| 3,740 | 3,744 | Perforated |
| 3,740 | 3,745 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 103 | 12.25 | 50 S |
| 8.625 | 103 | — | — |
| 1.25 | 3,498 | — | — |
| 1.25 | 3,720 | — | — |
| 4.5 | 3,834 | — | — |
| 4.5 | 3,835 | 6.25 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 28, 1993 | Mar 3, 1993 | — |
| 00 | Mar 12, 1993 | — | — |
| 00 | Jan 12, 1984 | Apr 4, 1962 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-247-01726 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-247-01726 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24701726, documented in the API reference.