WELL · 42-247-32017 · DISTRICT 4
Marrs McLean Trust -C- #15
Jim Hogg County · Thompsonville NE. (13700 FB-A) field · Vertical
Marrs Mclean Trust -C- #15 (API 42-247-32017) is a plugged well in Jim Hogg County, plugged March 30, 2001, last operated by BP America Production Company.
The RRC has issued 2 drilling permits between 1993 and 1994, permitted to 15,000 ft.
It was permitted by Vastar Resources, Inc. and has since transferred to BP America Production Company on the wellbore schedule.
Completion filings report 4 formation tops, including Queen City, First Hinnant, Second Hinnant, Fifth Hinnant.
Operator of record
Permitted by Vastar Resources, Inc.; the EWA schedule now lists a different operator.
Denver, CO · P-5 Y, filed May 4, 2026 · 1,623 permits on file · (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BP America Production Company |
| Production reports | Vastar Resources, Inc.through Dec 1996 |
| Latest permit | Vastar Resources, Inc.Aug 5, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,000
- total depth, ft
- 2
- permits on file
- Aug 5, 1994
- last permit issued
- Mar 21, 1994
- completed
- 0
- cumulative oil, bbl
- 372K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH May 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 21, 1994
- Shut in
- —
- Plugged
- Mar 30, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Marrs McLean Trust -C- G-4-148843 | Thompsonville, NE. (13700 FB-A) | BP America Production Company | 1 | 0 | 104K | Mar 1994 – May 2009 |
| Marrs McLean Trust -C- G-4-151753 | Thompsonville, NE. (12500 FB-A) | Vastar Resources, Inc. | 1 | 0 | 267K | Sep 1994 – Mar 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Vastar Resources, Inc.Mar 1994 → Dec 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 426638-99 | Recompletion | Vastar Resources, Inc. | Aug 4, 1994 | Aug 5, 1994 | Aug 17, 1994 | 13,997 |
| 417022-99 | Drill | Arco Oil & Gas Co. | Oct 12, 1993 | Oct 15, 1993 | Dec 1, 1993 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-148843 | — | — | — | — |
| — | — G-4-151753 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 842 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 5,840 | -4,998 |
| First Hinnant | 9,945 | -9,103 |
| Second Hinnant | 10,670 | -9,828 |
| Fifth Hinnant | 12,735 | -11,893 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,692 | 12,706 | Perforated |
| 13,658 | 13,674 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,010 | 17.5 | 1,395 S |
| 9.625 | 8,800 | 12.25 | 1,200 S |
| 5.5 | 13,997 | 8.5 | 540 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 21, 1995 | Oct 24, 1994 | — |
| 00 | Jan 31, 1995 | Oct 5, 1994 | Yes |
| 00 | Nov 30, 1994 | — | — |
| 00 | Jun 9, 1994 | Apr 5, 1994 | — |
| 00 | Apr 28, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-247-32017 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-247-32017 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24732017, documented in the API reference.