WELL · 42-247-32323 · DISTRICT 4

Rancho Blanco Corporation/State #6

Y

Jim Hogg County · Z-Bar (Wilcox) field · Temp Abandoned  · Vertical

Rancho Blanco Corporation/State #6 (API 42-247-32323) is a well in Jim Hogg County operated by Central Gulf Petroleum Inc, completed October 30, 2008 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued September 8, 2005, permitted to 18,000 ft.

It was permitted by Aspen Exploration, Inc. and has since transferred to Central Gulf Petroleum Inc on the wellbore schedule.

Completion filings report 8 formation tops, including Wilcox, R - Sand, T - 3 Sand, T - 5 Sand.

No lease production has been reported under this well’s leases.

Operator of record

Central Gulf Petroleum Inc

Permitted by Aspen Exploration, Inc.; the EWA schedule now lists a different operator.

The Woodlands, TX · P-5 Y, filed Apr 4, 2026 · 10 permits on file · (512) 595-6469

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCentral Gulf Petroleum Inc
Production reportsCentral Gulf Petroleum Incthrough Apr 2025
Latest permitAspen Exploration, Inc.Sep 8, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

18,000
total depth, ft
1
permits on file
Sep 8, 2005
last permit issued
Oct 30, 2008
completed
0
cumulative oil, bbl
780K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 30, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rancho Blanco Corporation/State G-4-246185Z-Bar (Wilcox)Central Gulf Petroleum Inc10780KMar 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 665(-100%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Aspen Exploration, Inc.Nov 2008 → Apr 2009
  2. 2Zachry Exploration, Inc.Aug 2009 → Nov 2009
  3. 3Zachry Exploration, LLCDec 2009 → Aug 2011
  4. 4Escudo Oil & Gas, LLCMay 2015 → Nov 2022
  5. 5Central Gulf Petroleum IncDec 2022 → Apr 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
606047-99DrillAspen Exploration, Inc.Sep 8, 2005Sep 8, 2005Jul 12, 200618,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-246185————

Formation tops

As filed on W-2/G-1. Subsea from 549 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX H Q SAND11,024-10,475
WilcoxWILCOX HQ SAND11,024-10,475
R - Sand15,272-14,723
T - 3 Sand15,941-15,392
T - 5 Sand16,175-15,626
T - 6 Sand16,488-15,939
T - 9 Sand17,064-16,515
T - 1017,184-16,635
T - 10 Sand17,184-16,635
WilcoxWILCOX U - 1 SAND17,554-17,005

Perforations

Perforated and open-hole intervals.

FromToType
17,19617,220Perforated
17,23017,244Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
161,35720703 S
11.758,76014.75805 S
9.62513,39010.625525 S
5.518,0258.5950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 2009Nov 20, 2008—
00Apr 28, 2009Feb 4, 2008Yes
00Apr 6, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24732323, documented in the API reference.