WELL · 42-249-01169 · DISTRICT 4

Shaeffer Ranch -A- #27

Plugged

Jim Wells County · Rowena North (Hockley) field  · Vertical

Shaeffer Ranch -A- #27 (API 42-249-01169) is a plugged well in Jim Wells County, plugged July 6, 2001, last operated by Slawson Exploration Company Inc.

The RRC has issued one drilling permit, issued January 20, 1995, permitted to 6,600 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Slawson Exploration Company Inc on the wellbore schedule.

Its 2 leases have reported 41.5K barrels of oil and 1.95M mcf of gas since January 1993, last reporting in August 2001. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Slawson Exploration Company Inc

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Jul 3, 2020 · 167 permits on file · (888) 887-5930

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSlawson Exploration Company Inc
Production reportsTexaco E & P Inc.through Jul 1996
Latest permitTexaco E & P Inc.Jan 20, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,600
total depth, ft
1
permits on file
Jan 20, 1995
last permit issued
May 4, 1968
completed
41.5K
cumulative oil, bbl
1.95M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 4, 1968
Shut in
—
Plugged
Jul 6, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shaeffer Ranch -A- O-4-4407Rowena, North (Hockley)Slawson Exploration Company, Inc841.5K1.72MJan 1993 – Aug 2001
Shaeffer Ranch -A- G-4-152735Rowena, North (Hockley)Slawson Exploration Company, Inc10237KJan 1995 – Jul 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Jul 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
432063-99ReclassTexaco E & P Inc.Jan 20, 1995Jan 20, 1995—6,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-152735————
—— O-4-4407————

Perforations

Perforated and open-hole intervals.

FromToType
4,7624,766Perforated
4,7724,778Perforated
4,7864,790Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,606——
8.6251,61711.75360 S
4.56,5076.75325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 29, 1995Jan 20, 1995—
00Feb 9, 1995——
00Jan 9, 1989Nov 30, 1988—
00Jan 12, 1984Jul 26, 1960—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000004543H-1 InjectionPlugged Aug 1, 2001004,762–4,790

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24901169, documented in the API reference.