WELL · 42-249-02870 · DISTRICT 4

Seeligson Unit #0173A

N

Jim Wells County  · Vertical

Seeligson Unit #0173A (API 42-249-02870) is a permitted well in Jim Wells County filed by Triad Energy Corporation; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1991 and 2010, permitted to 6,730 ft.

Completion filings report one formation top, including Frio.

Operator of record

Triad Energy Corporation

Houston, TX · P-5 Y, filed Sep 6, 2013 · 138 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsJetta Operating Company, Inc.through Mar 2014
Latest permitTriad Energy CorporationDec 23, 2010
6,730
total depth, ft
4
permits on file
Dec 23, 2010
last permit issued
—
completed
0
cumulative oil, bbl
11.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Seeligson Unit G-4-261224Seeligson (Combined Zones)Sue-Ann Operating, L.C.1011.7KMar 2011 – Jul 2026
Seeligson, A. A. G-4-140607Seeligson (Zone 20-E-01,02)Triad Energy Corporation100Jan 1993 – Apr 2011
— G-4-13703——000—
— G-4-138874——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Triad Energy CorporationMar 2011 → Oct 2011
  2. 2Jetta Operating Company, Inc.Nov 2011 → Mar 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
704159-99RecompletionTriad Energy CorporationOct 21, 2010Dec 23, 2010Apr 25, 20116,730
421198-99RecompletionMobil Producing TX. & N.M. Inc.Feb 15, 1994Feb 15, 1994—6,730
393936-99RecompletionMobil Producing TX. & N.M. Inc.Nov 13, 1991Nov 13, 1991Dec 8, 19916,730
388259-99RecompletionMobil Producing TX. & N.M. Inc.May 23, 1991May 23, 1991Jun 26, 19916,730

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-13703————
—— G-4-138874————
—— G-4-140607————
—— G-4-261224————

Formation tops

As filed on W-2/G-1. Subsea from 12 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO 16C SAND5,408-5,396

Perforations

Perforated and open-hole intervals.

FromToType
5,4085,415Perforated
6,0906,100Perforated
6,3426,361Perforated
—6,583Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,034151,500 S
76,7299.875950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 3, 2011May 23, 2011—
00Mar 6, 1992Feb 12, 1992Yes
00Feb 24, 1992——
00Sep 18, 1991Jul 31, 1991Yes
00Aug 7, 1991——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24902870, documented in the API reference.