WELL · 42-249-30575 · DISTRICT 4
Wendling #1
Jim Wells County · Vertical
Wendling #1 (API 42-249-30575) is a plugged well in Jim Wells County, plugged February 11, 2026, last operated by Progas Operating, Inc.
The RRC has issued 4 drilling permits between 1977 and 2015, permitted to 3,800 ft.
Operator of record
Red Rock, TX · P-5 Y, filed Dec 4, 2025 · 29 permits on file · (512) 213-4805
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Progas Operating, IncSep 29, 2015 |
- 3,800
- total depth, ft
- 4
- permits on file
- Sep 29, 2015
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 11, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 810436-99 | Reenter | Progas Operating, Inc | Sep 17, 2015 | Sep 29, 2015 | — | 3,775 |
| 762435-99 | Reenter | Progas Operating, Inc | May 9, 2013 | May 14, 2013 | — | 3,775 |
| 83270-99 | Recompletion | Peninsula Resources Corp. | Jun 9, 1980 | Jun 9, 1980 | — | 3,550 |
| 2908-99 | Drill | Peninsula Resources Corp. | Jul 13, 1977 | Jul 13, 1977 | — | 3,800 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,053 | 2,260 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 250 | 12.25 | 200 S |
| 4.5 | 3,746 | 7.875 | 765 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jul 12, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-30575 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-30575 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24930575, documented in the API reference.