WELL · 42-249-32225 · DISTRICT 4
Boerner Unit #1
Jim Wells County · Henshaw (5660 Sand) field · Vertical
Boerner Unit #1 (API 42-249-32225) is a plugged well in Jim Wells County, plugged March 10, 1997, last operated by Harper Hefte Inc..
The RRC has issued one drilling permit, issued December 10, 1993, permitted to 5,900 ft.
Completion filings report 3 formation tops, including 1st Het, Kolher, 1st Stillwell.
Its 2 leases have reported 2.3K barrels of oil and 96.6K mcf of gas since March 1994, last reporting in May 1997. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Corpus Christ, TX · P-5 Active, filed Apr 16, 2026 · 87 permits on file · (361) 242-9149
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Harper Hefte Inc. |
| Production reports | Harper Hefte, Inc.through Sep 1996 |
| Latest permit | Harper Hefte, Inc.Dec 10, 1993 |
- 5,900
- total depth, ft
- 1
- permits on file
- Dec 10, 1993
- last permit issued
- Mar 12, 1994
- completed
- 2.3K
- cumulative oil, bbl
- 96.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH May 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 12, 1994
- Shut in
- —
- Plugged
- Mar 10, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Boerner Unit O-4-12316 | Henshaw (5660 Sand) | Harper Hefte, Inc. | 1 | 2.3K | 95.4K | Mar 1994 – May 1997 |
| Boerner Unit G-4-159862 | Henshaw (5660 Sand) | Harper Hefte, Inc. | 1 | 0 | 1.11K | Jun 1996 – Mar 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Harper Hefte, Inc.Mar 1994 → Sep 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 419114-99 | Drill | Harper Hefte, Inc. | Dec 8, 1993 | Dec 10, 1993 | Feb 4, 1994 | 5,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-159862 | — | — | — | — |
| — | — O-4-12316 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 151 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 1ST Het | 2,995 | -2,844 |
| Kolher | 5,100 | -4,949 |
| 1ST Stillwell | 5,745 | -5,594 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,665 | 5,672 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 608 | 12.25 | 250 S |
| 2.875 | 5,847 | 7.875 | 1,310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 29, 1996 | Aug 22, 1996 | — |
| 00 | Sep 27, 1996 | — | — |
| 00 | May 12, 1994 | Mar 16, 1994 | Yes |
| 00 | Apr 13, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-32225 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-32225 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24932225, documented in the API reference.