WELL · 42-249-32255 · DISTRICT 4
Boegner P. GU #2
Jim Wells County · Ben Bolt N. (Lower Yegua) field · Vertical
Boegner P. GU #2 (API 42-249-32255) is a plugged well in Jim Wells County, plugged December 3, 2024, last operated by Rock Resources Inc..
The RRC has issued 2 drilling permits between 1995 and 2007, permitted to 10,000 ft.
Completion filings report 2 formation tops, including Yegua, Lwer Yegua.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed Jun 4, 2026 · 12 permits on file · (361) 877-7080
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rock Resources Inc. |
| Production reports | Rock Resources, Inc.through Apr 2008 |
| Latest permit | Rock Resources, Inc.Sep 27, 2007 |
- 10,000
- total depth, ft
- 2
- permits on file
- Sep 27, 2007
- last permit issued
- Feb 27, 1996
- completed
- 0
- cumulative oil, bbl
- 464K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Dec 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 27, 1996
- Shut in
- —
- Plugged
- Dec 3, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Boegner, Patricia et. al. GU G-4-233332 | Alice (Stillwell) | Dark Horse Producing of TX, L.P. | 1 | 0 | 9.19K | Oct 2007 – Dec 2024 |
| Boegner, P. GU G-4-158037 | Ben Bolt N. (Lower Yegua) | Rock Resources, Inc. | 1 | 0 | 455K | Feb 1996 – Oct 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Coastal Oil & Gas CorporationFeb 1996 → Apr 2000
- 2Cliffwood Production Co.May 2000 → Feb 2001
- 3Ocean Energy, Inc.Mar 2001 → Nov 2002
- 4Rock Resources, Inc.Oct 2007 → Apr 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 644061-99 | Recompletion | Rock Resources, Inc. | Aug 8, 2007 | Sep 27, 2007 | Oct 1, 2007 | 8,785 |
| 442901-99 | Drill | Anr Production Company | Dec 18, 1995 | Dec 18, 1995 | Feb 2, 1996 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-158037 | — | — | — | — |
| — | — G-4-233332 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 213 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,005 | 6,020 | Perforated |
| 8,493 | 8,506 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 815 | 12.25 | 303 S |
| 7 | 5,882 | 8.75 | 209 S |
| 2.875 | 8,775 | 4.125 | 120 S |
| 2.875 | 8,785 | 4.125 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 2008 | Dec 4, 2007 | Yes |
| 00 | Feb 28, 2008 | — | — |
| 00 | Jun 10, 1996 | Mar 27, 1996 | Yes |
| 00 | May 24, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-32255 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-32255 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.