WELL · 42-251-30219 · DISTRICT 9

S. Mann SWD #1

WaterY

Johnson County · Newark East (Barnett Shale) field · Injection  · Vertical

S. Mann Swd #1 (API 42-251-30219) is a well in Johnson County operated by Tep Barnett USA LLC, completed November 25, 2020 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued June 29, 2004, permitted to 9,800 ft.

It was permitted by Hallwood Swd, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Atoka, Marble Falls, Barnett, Ellenburger.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 578K barrels injected in the 12 months reported through September 2025.

Operator of record

TEP Barnett USA LLC

Permitted by Hallwood SWD, Inc.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Feb 4, 2026 · 371 permits on file · (877) 814-2034

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsnone
Latest permitHallwood SWD, Inc.Jun 29, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,800
total depth, ft
2
permits on file
Jun 29, 2004
last permit issued
Nov 25, 2020
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 25, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
S. Mann SWD O-13-30662Newark, East (Barnett Shale)TEP Barnett USA, LLC100Sep 2004 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
547305-98DrillHallwood SWD, Inc.Jul 12, 2004Jun 29, 2004—9,800
547305-99DrillHallwood SWD, Inc.Jun 22, 2004Jun 29, 2004—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-30662————

Formation tops

As filed on W-2/G-1. Subsea from 836 ft elevation.Download CSV →

FormationMD ftSubsea
Atoka5,155-4,319
Marble Falls6,334-5,498
BarnettBARNETT SHALE6,620-5,784
EllenburgerELLENBERGER7,082-6,246
Ellenburger7,082-6,246

Perforations

Perforated and open-hole intervals.

FromToType
7,0417,069Perforated
7,6279,520Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,38413.75550 S
77,6279.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 8, 2020Dec 3, 2020—
00Dec 17, 2015Oct 1, 2015—
00Dec 15, 2015Nov 25, 2014—
00Feb 12, 2007Dec 22, 2004Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

578K
bbl, last 12 reported months
61.6M
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094931W-14 DisposalActive16,5002,5007,416–9,520

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 577,633 · prior 12 650,105(-11%)

050K100K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25130219, documented in the API reference.