WELL · 42-251-30605 · DISTRICT 13

G-2622 "A" #1

N

Johnson County  · Vertical

G-2622 "A" #1 (API 42-251-30605) is a former disposal or injection well in Johnson County, last operated by Western Assets Management, Inc.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued November 1, 2005, permitted to 8,999 ft.

Operator of record

Western Assets Management, Inc.

Fort Worth, TX · P-5 Y, filed Feb 3, 2023 · 2 permits on file · (817) 296-0605

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWestern Assets Management, Inc.Nov 1, 2005
8,999
total depth, ft
1
permits on file
Nov 1, 2005
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
608009-99DrillWestern Assets Management, Inc.Oct 17, 2005Nov 1, 2005—8,999

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Sep 2008
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096021W-14 DisposalCanceled Oct 19, 202225,0003,0006,700–9,400

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012008

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25130605, documented in the API reference.