WELL · 42-253-01880 · DISTRICT 7

Griffith #1WI

Y

Jones County · Ball-Kuehn (Strawn Lower) field · Injection  · Vertical

Griffith #1WI (API 42-253-01880) is a well in Jones County operated by Grayrock Energy II LLC, completed May 14, 2008 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued February 4, 2008, permitted to 4,800 ft.

It was permitted by L.C.S. Production Company and has since transferred to Grayrock Energy II LLC on the wellbore schedule.

Completion filings report one formation top, including Strawn.

Its lease has reported 637 barrels of oil since March 2008, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 5.21K barrels injected in the 12 months reported through October 2025.

Operator of record

Grayrock Energy II LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · (214) 234-9115

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayrock Energy II LLC
Production reportsPlantation Operating, LLCthrough May 2009
Latest permitL.C.S. Production CompanyFeb 4, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,800
total depth, ft
1
permits on file
Feb 4, 2008
last permit issued
May 14, 2008
completed
637
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 14, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Griffith O-8-30075Ball-Kuehn (Strawn, Lower)Grayrock Energy II, LLC26370Mar 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyJun 2008 → Apr 2009
  2. 2Plantation Operating, LLCMay 2009 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
653953-99ReenterL.C.S. Production CompanyJan 24, 2008Feb 4, 2008Apr 30, 20084,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-30075————

Formation tops

As filed on W-2/G-1. Subsea from 1,785 ft elevation.Download CSV →

FormationMD ftSubsea
StrawnSTRAWN SAND4,617-2,832

Perforations

Perforated and open-hole intervals.

FromToType
4,6174,625Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625137——
4.54,8007.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 2009Jun 4, 2008Yes
00Dec 16, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.21K
bbl, last 12 reported months
1.47M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000098857H-1 InjectionActive1,5002,3004,610–4,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,205 · prior 12 3(+173400%)

05001K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25301880, documented in the API reference.