WELL · 42-253-04664 · DISTRICT 7

Bumpass, E. B. & Tinah #8A

N

Jones County  · Vertical

Bumpass, E. B. & Tinah #8A (API 42-253-04664) is a former disposal or injection well in Jones County, last operated by Bell, Johnny Inc.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued January 18, 2000, permitted to 4,565 ft.

Operator of record

Bell, Johnny Inc.

Abilene, TX · P-5 Y, filed Oct 2, 2020 · 13 permits on file · (214) 213-9095

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBell, Johnny Inc.Jan 18, 2000
4,565
total depth, ft
1
permits on file
Jan 18, 2000
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
491120-99ReenterBell, Johnny Inc.Jan 14, 2000Jan 18, 2000—4,565

Perforations

Perforated and open-hole intervals.

FromToType
—4,540Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000120034UIC PermitPlugged Jul 16, 1987501,2004,539–4,550

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25304664, documented in the API reference.