WELL · 42-253-07625 · DISTRICT 7

TLM Culwell #6

Plugged

Jones County · Griffin field  · Vertical

Tlm Culwell #6 (API 42-253-07625) is a plugged well in Jones County, plugged May 17, 2013, last operated by Msn Oil Inc..

The RRC has issued one drilling permit, issued August 8, 2006, permitted to 3,256 ft.

It was permitted by B & G Energy Corporation and has since transferred to Msn Oil Inc. on the wellbore schedule.

Completion filings report one formation top, including Palo Pinto.

Its lease has reported 13.8K barrels of oil since November 2003, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

MSN Oil Inc.

Permitted by B & G Energy Corporation; the EWA schedule now lists a different operator.

Avoca, TX · P-5 Y, filed Feb 4, 2026 · (325) 280-9825

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMSN Oil Inc.
Production reportsMSN Oil, Inc.through Apr 2026
Latest permitB & G Energy CorporationAug 8, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,256
total depth, ft
1
permits on file
Aug 8, 2006
last permit issued
—
completed
13.8K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 17, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TLM Culwell O-8-29313GriffinMSN Oil, Inc.313.8K0Nov 2003 – Jul 2026

Oil, barrels lease total

Last 12 months 71 · prior 12 63(+13%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1B & G Energy CorporationNov 2003 → Oct 2011
  2. 2Royal Texan Energy Co.Jul 2012 → Sep 2013
  3. 3Royal Texan Resources Co.Oct 2013 → Dec 2013
  4. 4J.C. OperatingJan 2014 → Aug 2016
  5. 5M & K Operating LLCSep 2016 → May 2022
  6. 6MSN Oil, Inc.Jun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
623696-99ReenterB & G Energy CorporationAug 2, 2006Aug 8, 2006Mar 13, 20063,256

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-29313————

Formation tops

As filed on W-2/G-1. Subsea from 1,528 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto3,230-1,702

Perforations

Perforated and open-hole intervals.

FromToType
3,2323,256Perforated
—3,250Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
101261175 S
4.53,2405.596 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 2008Jul 31, 2006—
00May 13, 2008——
00Jan 12, 1984Jul 25, 1939—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
346K
bbl, all reported
Oct 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094810H-1 InjectionPlugged Jun 20, 20132,0001,2503,232–3,256

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25307625, documented in the API reference.